My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> I 1-04.4 Changes <br /> (******) <br /> Delete 1-04.4 and substitute the following: <br /> I 1-04.4(1) City's Right to Direct Changes to the Work <br /> (******) <br /> The City reserves the right to change the Work at any time. Such changes shall not <br /> I <br /> invalidate the Contract nor release the Surety, and the Contractor agrees to perform the <br /> Work as changed. Among others, these changes and alterations may include: <br /> 1. Deleting or omitting any part of the Work, Equipment or material to be provided <br /> Iunder this Contract, <br /> 2. Increasing or decreasing quantities, <br /> I 3. Altering Specifications, designs, or both, <br /> 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> I 6. Altering facilities, Equipment, materials, services, or sites, provided by the City, <br /> and <br /> 7. Ordering the Contractor to accelerate or Delay the Work. <br /> IIf the Contractor and City do not agree upon scope of Work changed or adjustment to the <br /> Contract Sum and Contract Time, the City may, at its sole option, unilaterally direct the <br /> Contractor to implement City directed change by notice. The City shall not pay or be <br /> I responsible or liable for changes implemented by the Contractor without explicit notice from <br /> the City to proceed. <br /> 1-04.4(2) Extra Work <br /> At its sole option, the City may (1) perform Extra Work itself, (2) employ others to do it, (3) <br /> direct the Contractor to perform the Extra Work at existing unit Bid price, (4) direct the <br /> IContractor to perform the Extra Work at a mutually agreed upon price, or (5) direct the <br /> Contractor to perform the Extra Work on a Force Account basis. <br /> I <br /> 1-04.4(3) Change Orders <br /> (******) <br /> Changes to the Work may result in an increase or decrease in Contract Sum, as provided <br /> in 1-09.4 Equitable Adjustment. Requests for an increase in Contract Time shall be made <br /> Ias provided in 1-08.3 PROGRESS SCHEDULE as applicable. Substantial changes in <br /> Contract Time, Contract Sum or Work will often be negotiated and agreed between the <br /> Contractor and City before the City directs the Contractor to proceed with the change. <br /> IIf the Contractor and City agree on the scope of Work and any changes to Contract Sum <br /> and Contract Time, the Contractor and City shall execute an agreed Change Order. <br /> However, if the Contractor and City do not agree, the City may, in its sole discretion, issue <br /> I a unilateral Change Order in the form attached to the Contract Documents changing the <br /> scope of Work and making any adjustments to the Contract Sum pursuant to 1-09.4 <br /> EQUITABLE ADJUSTMENT and Contract Time pursuant to 1-08.8 EXTENSIONS OF <br /> I TIME in such amount and for such time as the City believes appropriate. Contractor agrees <br /> to use the agreed Change Order form attached to the Contract Documents. The Contractor <br /> accepts all requirements, terms and conditions of a Change Order by: signing <br /> I <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> IWork Order#UP3768 SP 1-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.