CITY OF EVERETT SPECIAL PROVISIONS <br /> To detail and illustrate the Work, the City's Representative may furnish to the Contractor additional <br /> drawings and explanations consistent with the original Plans. The Contractor shall perform the <br /> Work according to these additional drawings and explanations. <br /> The City's Representative may appoint assistants and inspectors to assist in determining that the <br /> 1 Work and materials meet the Contract requirements. Assistants and inspectors have the authority <br /> to reject defective material and suspend Work that is being done improperly, subject to the final <br /> decisions of the City's Representative or, when appropriate, the City. <br /> Assistants and inspectors are not authorized to accept Work, to accept materials, to issue <br /> instructions, or to give advice that is contrary to the Contract. Work done or material furnished that <br /> does not meet the Contract requirements shall be at the Contractor's risk and shall not be a basis <br /> for a Contract Claim even if the inspectors or assistants purport to change the Contract. <br /> Assistants and inspectors may advise the Contractor of any faulty work or materials or <br /> infringements of the terms of the Contract; however, failure of the City's Representative or the <br /> assistants or inspectors to advise the Contractor does not constitute acceptance or approval. <br /> 1-05.3 Working Drawings <br /> Revise the second paragraph to read as follows: <br /> 1. Type 1 —Submitted for City information. Submittal must be received by the City a minimum <br /> of 7 working days before Work represented by the submittal begins. <br /> 2. Type 2—Submitted for City review and comment. Unless otherwise stated in the Contract, <br /> the Engineer will require up to 15 working days from the date the Working Drawing is received <br /> until it is returned to the Contractor. The Contractor shall not proceed with the Work <br /> represented by the Working Drawing until comments from the Engineer have been addressed. <br /> r3. Type 2E—Same as a Type 2 Working Drawing with Engineering as described below. <br /> 4. Type 3— Submitted for City review and approval. Unless otherwise stated in the Contract, <br /> the Engineer will require up to 20 working days from the date the Working Drawing is received <br /> until it is returned to the Contractor. The Contractor shall obtain the Engineer's written <br /> approval before proceeding with the Work represented by the Working Drawing. <br /> 5. Type 3E— Same as a Type 3 Working Drawing with Engineering as described below. <br /> Supplement 1-05.3 as follows: <br /> The Contract Documents include Plans that show such details as are reasonably necessary <br /> to give a comprehensive understanding of the Work. The Contractor shall submit alterations <br /> affecting the requirements and information in the Plans in writing to the Engineer for approval <br /> 1 prior to performing such Work. <br /> The Engineer may supplement the Plans with additional drawings and explanations, <br /> consistent with the purpose and intent of the original Plans, to detail and illustrate the Work. <br /> The Contractor shall perform the Work according to these supplemental drawings and <br /> explanations. <br /> In addition to supplemental drawings furnished by the Engineer, the Contract Documents may <br /> also be supplemented by Type 1, Type 2 or 2E, and Type 3 or 3E Working Drawings <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> Work Order#UP3768 SP 1-25 <br />