Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> prepared bythe Contractor, material supplier, or manufacturer,when necessaryor as required <br /> pP q <br /> by the Contract Documents to detail and illustrate portions of the Work. All types of Working <br /> Drawings shall be reviewed by the Engineer before work pursuant to those Working Drawings <br /> is performed. Type 3 and 3E Working Drawings may include, and not be limited to, shop <br /> details, erection plans, masonry lay-out diagrams, reinforcing steel and bending diagrams, <br /> post tensioning plans, shoring, cribbing, cofferdam, or falsework plans, formwork plans, or <br /> hydraulic items. Type 2 and 2E Working Drawings may include, and not be limited to, Catalog <br /> cuts or standard plans for commonly used manufactured items. <br /> The Contractor shall be fully responsible for the accuracy of dimensions and details on <br /> Working Drawings, and for complete conformity with the Contract Documents, even if the <br /> Working Drawings have been approved by the Engineer, or if the Contractor and the Engineer I <br /> agree on dimensions and details. The City does not accept Working Drawings as accurate or <br /> adequate, and does not take responsibility for, or warrant that Working Drawings will meet <br /> Contract requirements. <br /> Engineer's review of Working Drawings shall not relieve Contractor from responsibility for <br /> variation from the requirements of the Contract Documents unless Contractor has in writing <br /> called the Engineer's attention to each such variation at the time of submission, and the <br /> Engineer has given written approval of each such variation by a specific written notation <br /> thereof incorporated in or accompanying the returned Working Drawing; nor will review by <br /> Engineer relieve Contractor from responsibility for errors or omissions in the Working <br /> Drawings or from responsibility for having complied with the provisions of this section. <br /> The Bid prices shall include all costs for furnishing Working Drawings and Submittals. I <br /> The following listed sections of the Standard Specifications and Special Provisions require <br /> Working Drawings that may or may not be applicable to this specific project. ***This list is <br /> supplied as an aid to the Contractor and is not to be considered comprehensive. Submittal <br /> requirements may be found in 1-05.3(1) or elsewhere in these Special Provisions. Notable <br /> submittals include: I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> Work Order#UP3768 SP 1-26 <br />