My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> A sufficient number of bench marks for levels to enable the Contractor to set grades <br /> at reasonably short distances. <br /> Monuments and control points as shown on the Plans. <br /> The Contractor shall coordinate with the City and Port of Everett and give the se <br /> agencies three weeks notification to allow adequate time to provide the above data. <br /> The Contractor shall ensure a surveying accuracy within the following tolerances: <br /> 1. Slope stakes ±0.1 foot <br /> 2. Subgrade blue tops ±0.01 foot <br /> 3. Stationing ±0.01 foot <br /> 4. Alignment ±0.01 foot <br /> 5. Surfacing red & yellow tops ±0.01 foot <br /> 6. Superstructure elevations ±0.01 foot (from plan elevations) <br /> 7. Substructure ±0.02 foot (from plan elevations) <br /> 8. Utility grade stakes ±0.01 foot <br /> 9. Manholes, vaults and structures ±0.01 foot <br /> The Contractor shall slope stake the roadway and/or utility centerline before any construction <br /> may proceed. Slope stakes shall be set at 50' maximum intervals on tangents and 25' on <br /> curves. Pipe stakes shall be set at a minimum 25' interval on tangent and 10' intervals on <br /> curves with stakes at alignment control points. <br /> Subgrade bluetops and surfacing red and yellow tops shall be set at 50' intervals in tangent <br /> sections, 25' intervals in curve sections, and 10' intervals in intersection radii. <br /> The Contractor's surveyor shall be a licensed surveyor in the State of Washington. The <br /> Contractor shall keep updated survey field notes in a standard field book and in a format set <br /> by the Engineer. These field notes shall include all survey work performed by the Contractor's <br /> surveyor in establishing line, grade and slopes for the construction work. Copies of these field <br /> notes shall be provided to the Engineer upon request and upon completion of the Contract <br /> Work; the field book shall be submitted to the Engineer and become property of the City. <br /> If the survey work provided by the Contractor does not meet the standards of the Engineer, <br /> then the Contractor shall, upon the Engineer's written request, remove the individual or <br /> individuals doing the survey work and the survey work will be completed by the Engineer at <br /> the Contractor's expense. Costs for completing the survey work required by the Engineer will <br /> be deducted from monies due or to become due the Contractor. <br /> The City may spot-check the Contractor's surveying. These spot-checks will not change the <br /> requirements for normal checking and testing as described elsewhere, and do not relieve the <br /> Contractor of the responsibility of producing a finished product that is in accordance with the <br /> Contract. <br /> In all disputes concerning accuracy of lines and elevations, the City shall be assumed correct <br /> and the Contractor shall correct the discrepancies before construction work may proceed. No <br /> additional compensation will be paid for this corrective Work. <br /> ***Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications as amended by the Special <br /> Provisions. *** <br /> 1-05.6 Inspection of Work and Materials <br /> Supplement 1-05.6 by adding the following: <br /> I <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> Work Order#UP3768 SP 1-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.