Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> or expenses caused in whole or in part by Contractor's failure to submit required information <br /> in sufficient time for review, comment, and correction. Contractor's failure to submit required <br /> information in sufficient time for review, comment and correction shall be deemed a waiver of <br /> any and all Contract Claims for adjustment of Contract Sum or Contract Time arising out of, <br /> or related to, such a Submittal. Contractor acknowledges and agrees that it may not rely upon <br /> receiving the City's response to a Submittal in less than 14 calendar days, unless the City <br /> explicitly changes this section by a signed Change Order. <br /> 1-05.3(2) Requests for Information <br /> (******) I <br /> Requests for information or clarification from the Contractor to the City shall be treated as a <br /> Submittal pursuant to 1-05.3(1) SUBMITTALS. <br /> 1-05.4 Conformity With and Deviations From Plans and Stakes <br /> Delete all of 1-05.4 and substitute the following: <br /> The Contractor shall be responsible for setting and maintaining all alignment stakes, slope <br /> stakes, and grading stakes as necessary for the construction of the roadbed, surfacing, <br /> paving, channelization, illumination, utilities, piping, structures, signing, bridges, and retaining <br /> walls, if such construction is included in this Project. The Contractor shall be responsible for <br /> coordinating with the Port of Everett for the location of control points and benches that are <br /> used on the POE-NT project and will be responsible for marking and staking easement, work <br /> zone boundaries and pipe and utility alignments. Calculations, surveying, and measuring111 <br /> required for setting and maintaining the necessary lines and grades shall be the Contractor's <br /> responsibility. The Contractor shall provide the City with copies of such calculations and <br /> staking data when requested by the Engineer. Copies of the City provided survey control data <br /> are available for the Bidder's inspection at the office of the Project Engineer. <br /> Any staking requirements for the Project that do not fit field conditions will be reviewed and if <br /> necessary, adjusted by the Engineer. Any necessary revisions to the staking information will <br /> be provided to the Contractor for use in completing the Work. <br /> Stakes, marks, and other reference points, including existing monumentation, set by the City <br /> shall be carefully preserved by the Contractor. The Contractor will be charged for the costs <br /> of replacing stakes, markers and monumentation that were not to be disturbed but were <br /> destroyed or damaged by the Contractor's operations. This charge will be deducted from <br /> monies due or to become due to the Contractor. I <br /> To facilitate the establishment of these lines and elevations, the City will provide the <br /> Contractor with the following survey control: <br /> ROADWAY, SURFACING AND PAVING I <br /> Establish elevation bench marks and center or base line alignment control points for <br /> the mainline, one time only. Provide right of way stakes where applicable. <br /> Provide rights-of-way, easements or right-of-entry. <br /> Provide the Contractor with technical advice if requested. <br /> Computed grades where needed. <br /> Provide horizontal and vertical curve data. <br /> One copy of transit notes showing reference to horizontal and vertical control points. <br /> UTILITIES, PIPING, AND OTHER STRUCTURES I <br /> Centerline or offset coordinates to centerline of the structure. <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> Work Order#UP3768 SP 1-28 1 <br />