Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor shall coordinate its work with other contractors and utility companies that may <br /> have facilities in the Project area and cooperate with them in accordance with the City-Port <br /> Agreement. The Contractor shall also coordinate its activities with the City; and no water <br /> mains, individual water services, street, or private driveways may be closed off without a <br /> minimum of five working days' notice to the City and the private property owner and not without <br /> the Engineer's authorization in advance of the Work. <br /> Final grading to subgrade and subgrade preparation in those areas disturbed by the utilities <br /> companies within the work zone as related to construction of this Project shall be the <br /> responsibility of the Contractor and included in the combined sewer construction and no <br /> additional compensation will be paid. <br /> The Contractor shall cooperate with the utility companies and their subcontractors and so <br /> conduct its operations that the necessary construction of their facilities can be accomplished <br /> to the mutual satisfaction of the City of Everett and the utility companies. <br /> *** It is anticipated that the following work adjacent or within the limits of the Project will be <br /> performed by others during the course of the Project and will require coordination for the Work. <br /> For clarity in the below subsection, the Contractor is called the "City Contractor" and the <br /> Project is called the "City Project". <br /> 1. The Port of Everett (POE) Norton Terminal Development & MTCA 3rd Interim Action <br /> Project (#MT-HT-2021-02.2), called the "POE-NT project", will be constructing <br /> concurrently with the City Project. The POE contractor for the POE-NT project is below <br /> called the "POE-NT Contractor." <br /> 2. The City Contractor shall be responsible for coordinating with the POE-NT Contractor and <br /> for coordinating City Project scheduling and work in a manner that eliminates or minimizes <br /> ' conflicts with the POE-NT project. The following describes the POE-NT project activities <br /> that are anticipated to occur within or adjacent to the City Project. The following also <br /> includes requirements for the City Contractor related to the POE-NT project: <br /> a. Work on the City Project must begin and progress as provided in the City-Port <br /> Agreement. Work on the City Project is limited to the License Area, as defined in <br /> the City-Port Agreement. The POE-NT Contractor will be constructing, removing, <br /> or actively monitoring an earthen fill embankment for pre-loading. The <br /> approximate limits for the preloading are indicated on the Plans. The City <br /> Contractor shall not access or perform construction within the pre-load area unless <br /> authorized by the City. It is anticipated that the POE-NT Contractor may be <br /> preloading until April 1, 2022. This date is contingent in nature and may be subject <br /> to change. The City Contractor is responsible for coordinating with the POE-NT <br /> Contractor to determine when the preloading constraints will end. The City <br /> Contractor is required to schedule and plan its work to avoid the POT-NT <br /> preloading site while the POE-NT Contractor is working or monitoring in this area. <br /> b. The POE-NT Contractor may be actively grading, constructing or installing utilities <br /> within or adjacent to the City Project limits. The City Contractor is responsible for <br /> coordinating with the POE-NT Contractor as provided in the City-Port Agreement <br /> and elsewhere in the Contract Documents. The City Contractor is also required to <br /> provide the Engineer with scheduling and updates. <br /> c. The City Contractor is required to stockpile excavated and import material on City <br /> property, located north of the Port of Everett property in the Port Gardner Storage <br /> Facility (PGSF) parking lot. It is anticipated that access to the City stockpile site <br /> may be provided through the NE corner of the PGSF property. Staging and <br /> stockpiling areas shall be approved by the Engineer in advance of construction <br /> I <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> Work Order#UP3768 SP 1-35 <br />