Laserfiche WebLink
CITY OF EVERETT SPECIAL 'PROVISIONS <br /> they become due and payable. If requested by the City, the Contractor shall promptly <br /> furnish proof of payment of such accounts to the City. <br /> 1-05.18(3)D Attention to Work 1 <br /> The Contractor, either in person or acting through its representative, shall give personal <br /> attention to and shall manage the Work so that it shall be prosecuted faithfully and <br /> completed under the Project schedule. When its representative is not personally present <br /> at the Project site, its designated alternate shall be available and shall have the authority <br /> to act in matters relating to this Contract. <br /> Where detailed construction requirements are not set forth in the Standard Specifications I <br /> or these Special Provisions, the Contractor shall perform the Work of a quality <br /> comparable to the workmanship specified for other parts of the Work, from firms having <br /> established good reputations for similar Work, or by following industry standard practices. I <br /> The Contractor shall perform all Work in compliance with and conforming to applicable <br /> building codes in effect at the time the Work is being performed. <br /> 1-05.18(3)E Safety I <br /> The Contractor alone shall be responsible for safety on the job site, including, but not <br /> limited to, the safety of its and its Subcontractor's employees. The Contractor shall <br /> maintain the Project site and perform the Work in a manner that meets the City's <br /> responsibility under statutory and common law for the provision of a safe place to work. <br /> 1-05.18(3)F Threats, Intimidation and Harassment Forbidden <br /> Contractor shall not allow its employees, its Subcontractors, its Subcontractors' <br /> employees, or any other agents to threaten bodily injury or property damage, to intimidate <br /> or attempt to intimidate any person, or to assault or physically harass any person. <br /> Forbidden conduct includes, but is not limited to, threatening, appearing, or actually doing <br /> any of the following: pushing, shoving, striking, physically blocking a person or a person's <br /> vehicle, vandalism, malicious mischief, or any other act that a reasonable person would <br /> understand be intended to intimidate, cause personal injury, or cause property damage. <br /> Contractor shall remove from the job site any person reasonably under its control or <br /> direction who the Contractor or City reasonably believes violated this section. The lack <br /> of a request from the City or City's Representative to the Contractor to remove someone <br /> from the job site does not relieve the Contractor from its obligation to remove someone. <br /> 1-05.18(3)G Weapons Forbidden <br /> Contractor shall not allow its employees, its Subcontractors, its Subcontractors' <br /> employees, or any other agents or representatives to carry or possess, openly or <br /> concealed, explosives or weapons on the job site, except: (a) such explosives are as <br /> reasonably required for performance of the Work, such as those necessary for blasting <br /> or demolition work called for by the Contract Documents or (b) commissioned law <br /> enforcement officers or security personnel under authority of their commission.A weapon <br /> is any object, instrument or chemical that is (1) designed in such a manner to inflict harm <br /> or injury to another person; or (2) any item used in a manner threatening harm or injury <br /> to another person. Weapons include, but are not limited to, firearms, dangerous knives, <br /> dangerous chemicals, tear gas, martial arts weapons, blackjacks or other weapons. <br /> Further, weapons should include those described in EMC Chapter 10.78. Possession of <br /> mace, pepper spray or the like for defensive purposes is not a violation of this policy. <br /> Contractor shall remove from the job site any person reasonably under its control or <br /> direction who the Contractor or City reasonably believes violated this section. The lack <br /> of a request from the City or City's Representative to the Contractor <br /> 1 <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> Work Order#UP3768 SP 1-38 1 <br />