My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor shall be in compliance at all times with all COVID-19 Requirements <br /> applicable to the Work. <br /> Contractor's Bid includes all costs necessary for the duration of the Work for compliance <br /> with Baseline COVID-19 Requirements. All such costs are included in the lump sum bid <br /> item entitled "Baseline COVID-19 Requirements." <br /> ' If the COVID-19 Requirements applicable to the Work at any time after Bid opening become <br /> less stringent than the Baseline COVID-19 Requirements, the Contractor may implement <br /> the less-stringent COVID-19 Requirements instead of the Baseline COVID-19 <br /> Requirements, but the City will be entitled to a deductive change order as described in <br /> Section 1-09.4(3) COVID-19 EQUITABLE ADJUSTMENTS. <br /> Supplement 1-07.1 by adding the following: <br /> ' The Contractor shall be in compliance with all applicable standards, orders, or <br /> requirements issued under Section 306 of the Clean Air Act [42 U.S.C. 1857(h)], Section <br /> 508 of the Clean Water Act(33 U.S.C. 1368), Executive Order 11738, and Environmental <br /> Protection Agency Regulations (40 CFR Part 15). (Contracts, subcontracts, and <br /> subgrants of amounts in excess of$100,000). <br /> The Contractor shall comply with mandatory standards and policies relating to energy <br /> ' efficiency that are contained in the state energy conservation plan issued in compliance <br /> with the Energy Policy and Conservation Act (Pub. L. 94-163). <br /> The City advises all general contractors and subcontractors that numerous Federal, <br /> State, and Local regulations exist that could affect the procedures used in the completion <br /> of this project. The City advises each prospective Contractor that they are responsible <br /> to be aware of and comply with all applicable statutes and regulations. It is recommended <br /> that each Contractor contact the local office of the following agencies for a list of <br /> applicable regulations and requirements that might affect the implementation of this <br /> project: <br /> ' Federal Environmental Protection Agency <br /> Washington Department of Health <br /> Washington Department of Ecology <br /> Washington Department of Fisheries <br /> Washington Department of Wildlife <br /> Washington Department of Labor& Industries <br /> Puget Sound Air Pollution Control Agency <br /> Municipal Building Department <br /> Municipal Planning Department <br /> Municipal Public Works Department <br /> If the scope of Work in this Contract includes Work at the City of Everett Water Filtration <br /> Plant or the Waste Water Pollution Control Facility, Contractor shall comply with the <br /> requirements of the Washington Department of Labor & Industries for such work <br /> ' including, but not limited to, Chapter 296-67 WAC. All costs associated or incurred in <br /> complying with these regulations or any other regulations listed above are included in the <br /> Contractor's Proposal. <br /> In cases of conflict between different safety regulations, the more stringent regulation <br /> shall apply. <br /> The Washington State Department of Labor and Industries shall be the sole and <br /> paramount administrative agency responsible for the administration of the provisions of <br /> the Washington Industrial Safety and Health Act of 1973 (WISHA). <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> Work Order#UP3768 SP 1-43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.