Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-06.3(1) Inspection at Point of Manufacturing <br /> (******) <br /> The Contractor shall be responsible to reimburse the City for the costs of inspections at the <br /> point of manufacturing for inspections occurring outside of Whatcom, Skagit, Island, <br /> Snohomish, King, Pierce and Thurston counties. Costs to be paid or reimbursed by the <br /> Contractor include, but are not limited to, travel, subsistence, labor and lodging expenses of <br /> the City Inspector. <br /> Point of manufacturing inspection will be required if: <br /> Inspection and testing of materials or Equipment in the vicinity of the Work by the City is <br /> not practicable, <br /> The Contractor requests the City to inspect and test material or Equipment at the point of <br /> manufacture, or <br /> The Standard Specifications or these Special Provisions require that inspection, testing <br /> or witnessing of tests take place at the point of manufacture. <br /> 1-06.4 Handling and Storing Materials <br /> Supplement 1-06.4 by adding the following: , <br /> Contractor shall store materials and Equipment so as to insure the preservation of their quality <br /> and fitness for the Work. Store Equipment and materials at location that facilitates inspection. <br /> The Contractor shall be responsible for damages, loss or casualty occurring to materials and <br /> Equipment until Final Acceptance. <br /> 1-06.6 Recycled Materials ' <br /> Delete 1-06.6 and its subsections and substitute the following: <br /> The Contractor shall make best effort to utilize recycled materials in the construction of the <br /> project as detailed in elsewhere in the Standard Specifications and these Special Provisions. <br /> Prior to Physical Completion Contractor shall report the quantity of recycled materials utilized <br /> in the construction of the project for each of the items listed in Section 9-03.21. Include hot <br /> mix asphalt, recycled concrete aggregate, recycled glass, steel furnace slag and other <br /> recycled materials (e.g. utilization of on-site material and aggregates from concrete returned <br /> to the supplier). Contractor shall provide report on DOT form 350-075A Recycled Materials <br /> Reporting. 1 <br /> SECTION 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC ' <br /> 1-07.1 Laws to be Observed <br /> Revise 1-07.1 by replacing the second sentence of the first paragraph with the following: <br /> The Contractor shall indemnify, defend, and save harmless the City (including its agents, ' <br /> officers, and employees) against any claims that may arise because the Contractor (or any <br /> employee of the Contractor or Subcontractor or material person) violated a legal <br /> requirement. <br /> Supplement 1-07.1 by adding the following: <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> Work Order#UP3768 SP 1-42 <br />