My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br /> ' WASHINGTON <br /> CITY OF EVERETT, WASHINGTON <br /> PUBLIC WORKS <br /> UTILITIES <br /> ADDENDUM NO. 1 <br /> PORT OF EVERETT <br /> COMBINED SEWER MAIN IMPROVEMENTS <br /> UP 3768 <br /> ' DATE OF ISSUANCE: November 24, 2021 <br /> Notice to Plan Holders: <br /> Addendum No. 1 contains revisions, additions, deletions, and/or clarifications and is hereby <br /> made a part of the contract documents for the above-named project and shall be considered by <br /> all prospective bidders in submitting bids. <br /> This Addendum consists of 82 pages, including all attachments. <br /> Bidders must acknowledge receipt of Addendum No. 1 in the space provided in the Bid <br /> Proposal. Failure to do so may subject the Bidder to bid disqualification. <br /> CONTRACT DOCUMENTS <br /> ADVERTISEMENT FOR BIDS <br /> In the first paragraph, delete "Tuesday, November 30, 2021" and replace with "Tuesday, <br /> December 7, 2021". <br /> DIVISION C - CONTRACT DOCUMENTS <br /> Replace Division C— Contract in its entirety with the attached Division C Section that is labeled <br /> "Addendum No. 1" in the footer. <br /> 1 SPECIAL PROVISION SPECIFICATIONS <br /> Revisions to the Special Provision Specifications are as follows: <br /> DIVISION 1 —GENERAL REQUIREMENTS: <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.