Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. 50-foot wide gravel access road to be constructed along NE portion of Port property to <br /> access City's PGSF Property to stockpile spoil materials when preload area is still in <br /> place. <br /> 5. Construction Environmental and Geotechnical Considerations <br /> a. Subject to Kimberly-Clark and Exxon Mobile MTCA sites (Section 2-09 &Appendix A) <br /> Soil and Groundwater Management Plans <br /> b. Dewatering to sewer and no discharge on site <br /> c. TESC measures <br /> 6. Other Notable Construction Considerations <br /> a. Structures <br /> i. Pipe, structures, and other items designed for Taylor"Big Red" THDC-978 Container <br /> Handler loading (Division 7and Division 9) <br /> b. Groundwater monitoring wells (7-05.3(100)) <br /> i. Monitoring Well decommissioning shall be done in accordance with WAC 173-160- <br /> 420 <br /> and shall be performed by licensed drillers in accordance with WAC 173-160- <br /> 420. <br /> ii. Monitoring Wells not specifically identified to be decommissioned are to be <br /> protected. <br /> 7. Port of Everett Norton Terminal Project Coordination ' <br /> a. Port may perform utility work across license area during construction. <br /> b. Coordination of work and schedule is required (Section 1-05.14) <br /> 8. Cultural Monitoring <br /> a. Cultural monitoring is required for this project (Section 1-07.16(4)) <br /> b. Subject to Port of Everett Norton Terminal Cultural Resources Monitoring and Discovery <br /> Plan (Appendix A) <br /> 9. Project Schedule <br /> a. Contract time for Physical completion in 180 calendar days and substantial completion <br /> 150 calendar days <br /> b. Interim Liquidated Damages of$10,000 per calendar day that is based on City-Port <br /> temporary construction license agreement expiration date. (Section 1-08.9) <br /> c. Project schedule, material catalogue cuts, and various plan submittals due following <br /> Notice to Proceed (Section 1-05.3) ' <br /> 10. Addendum items <br /> a. City of Everett/Port of Everett Temporary Construction License Agreement (Appendix D) <br /> b. Supplemental Exxon Mobile ADC Report (Appendix A) <br /> 11. Open Discussions <br /> I <br /> City of Everett UP3768 2 Pre-Bid Meeting Agenda <br />