Laserfiche WebLink
December 1,2021 <br /> DIVISION 7 —STORM, SEWER, WATER <br /> SECTION 7-20 SANITARY SEWER FORCEMAINS <br /> Revise Section 7-20.1(2) Combined Sewer (CS) as follows: <br /> Delete the sentence that states: <br /> The Engineer will furnish estimated bypass flow values for "dry weather" and "wet weather" <br /> conditions in each pipe segment of the Project. <br /> and replace with the following sentence: <br /> Temporary bypass pumping is not anticipated as flows will be able to be isolated by the City <br /> to make the connection to the existing 24-inch forcemain. <br /> Revise Section 7-20.2 Materials as follows: <br /> Delete Section Force Main Bypass System in its entirety. <br /> Delete Section 7-20.3(2) Sewer Bypass in its entirety. <br /> Delete Section 7-20.3(2) Demobilization in its entirety. <br /> Delete Section 7-20.3(3) Submittals in its entirety. <br /> INFORMATION AND CLARIFICATIONS <br /> Information and clarification requests that were received prior to issuance of this addendum are <br /> provided as an attachment. <br /> All other requirements of the contract documents remain in effect. <br /> City of Everett <br /> * .'"LN� <br /> I <br /> O'..So OF WAS/43.....p. <br /> ` z 11 4 z� <br /> 2320a <br /> CI8TEt Vi <br /> sIa1VAL <br /> Souheil Nasr, PE <br /> Project Manager <br /> Attachments: <br /> • Information Request and Clarification Summary <br /> I <br /> POE Combined Sewer Main Imp. Addendum No.2 <br /> Work Order#UP3768 Page 5 of 5 <br />