My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 1,2021 <br /> DIVISION 7 —STORM, SEWER, WATER <br /> SECTION 7-20 SANITARY SEWER FORCEMAINS <br /> Revise Section 7-20.1(2) Combined Sewer (CS) as follows: <br /> Delete the sentence that states: <br /> The Engineer will furnish estimated bypass flow values for "dry weather" and "wet weather" <br /> conditions in each pipe segment of the Project. <br /> and replace with the following sentence: <br /> Temporary bypass pumping is not anticipated as flows will be able to be isolated by the City <br /> to make the connection to the existing 24-inch forcemain. <br /> Revise Section 7-20.2 Materials as follows: <br /> Delete Section Force Main Bypass System in its entirety. <br /> Delete Section 7-20.3(2) Sewer Bypass in its entirety. <br /> Delete Section 7-20.3(2) Demobilization in its entirety. <br /> Delete Section 7-20.3(3) Submittals in its entirety. <br /> INFORMATION AND CLARIFICATIONS <br /> Information and clarification requests that were received prior to issuance of this addendum are <br /> provided as an attachment. <br /> All other requirements of the contract documents remain in effect. <br /> City of Everett <br /> * .'"LN� <br /> I <br /> O'..So OF WAS/43.....p. <br /> ` z 11 4 z� <br /> 2320a <br /> CI8TEt Vi <br /> sIa1VAL <br /> Souheil Nasr, PE <br /> Project Manager <br /> Attachments: <br /> • Information Request and Clarification Summary <br /> I <br /> POE Combined Sewer Main Imp. Addendum No.2 <br /> Work Order#UP3768 Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.