My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 1,2021 1 <br /> Replace Section 1-08.9 Liquidated Damages (including Section 1-08.9(1)) in its entirety with the <br /> following: <br /> Time is of the essence of the Contract. Delays inconvenience the public, obstruct other I <br /> work, interfere with and delay commerce, and increase risk. Delays also cost taxpayers <br /> undue sums of money, adding time needed for administration, engineering, inspection, and <br /> supervision. I <br /> ***Because the City finds it impractical to calculate the actual cost of delays, it has adopted <br /> the following formula to calculate liquidated damages for failure to complete the Work of the <br /> Contract on time. <br /> Accordingly, the Contractor agrees: <br /> 1. To pay$10,000 as liquidated damages for each and every calendar day required to <br /> accomplish substantial completion of the Work that is in excess of 120 calendar days <br /> after the effective date of the Notice to Proceed. <br /> 2. To pay$10,000 as liquidated damages for each and every calendar day required to <br /> accomplish physical completion of the Work that is in excess of the City-Port <br /> Agreement Expiration Date. <br /> 3. To authorize the Engineer to deduct these liquidated damages from any money due <br /> or coming due to the Contractor. I <br /> Substantial Completion Date and Physical Completion Date are defined in Section 1-01.3. <br /> The day the Engineer determines that the Work is substantially complete, the Engineer will <br /> notify the Contractor in writing of the Substantial Completion Date. The day the Engineer <br /> determines that the Work is physically complete, the Engineer will notify the Contractor in <br /> writing of the Physical Completion Date. ' <br /> Liquidated damages will not be assessed for any days for which an extension of time is <br /> granted. Further, the Contractor's total liability for liquidated damages will not exceed the <br /> City's liability to the Port for liquidated damages under the City-Port Agreement. No <br /> deduction or payment of liquidated damages will, in any degree, release the Contractor <br /> from further obligations and liabilities to complete the entire Contract. *** I <br /> DIVISION 2—EARTHWORK <br /> SECTION 2-09 STRUCTURE EXCAVATION <br /> Revise Section 2-09.3(3)B Excavation Using Open Pits— Extra Excavation as follows: <br /> Revise the sixth paragraph to read as follows: <br /> ***Excavation will consist of vertical trench excavation with shoring as shown on the Plans. <br /> The use of extra excavation will NOT be permitted on this project. *** <br /> Add the following under Section 2-09.5- Payment <br /> Unless included as a separate bid item, the use of Controlled Density Fill (CDF) in place of I <br /> normal backfill shall not be allowed unless authorized by the Engineer. <br /> I <br /> POE Combined Sewer Main imp. Addendum No.2 <br /> Work Order#UP3768 Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.