My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 12/30/2021
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
KPFF Consulting Engineers 12/30/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 10:26:31 AM
Creation date
1/21/2022 2:39:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
12/30/2021
Council Approval Date
12/22/2021
End Date
12/30/2025
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Later Phase Eclipse Mill Park Project
Tracking Number
0003149
Total Compensation
$600,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
KPFF Consulting Engineers 1/18/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Later Phase Eclipse Mill Project <br /> 300.4.4 Evaluate Liquefaction Potential <br /> The CONSULTANT shall reevaluate the susceptibility of the subsurface soils to <br /> liquefaction across the area and assess the potential impacts to the proposed <br /> improvements. Updates are required to address updated seismic codes. <br /> 300.4.5 Evaluate Slope Stability <br /> The CONSULTANT shall evaluate the global slope stability of the riverbank to <br /> identify potential impacts to the project. Results of the field reconnaissance, <br /> exploration, and testing programs will be incorporated in the analysis. Global <br /> stability will be evaluated using the limit equilibrium approach under static, <br /> seismic, and post liquefaction loading conditions. <br /> 300.4.6 Develop Final Design Level Sheet Pile Wall Recommendations <br /> The CONSULTANT shall provide geotechnical final design recommendations for <br /> sheet pile structures. <br /> 300.4.7 Develop Final Design Level Pile Foundation Recommendations <br /> The CONSULTANT shall provide geotechnical final design recommendations for <br /> pile foundations associated with the floating dock structure and debris barrier. <br /> 300.4.8 Develop Bank Stabilization Recommendations <br /> The CONSULTANT shall develop bank stabilization recommendation for both the <br /> Eclipse Mill Park and the Lowell Riverfront Trail sites. <br /> 300.4.9 HWA QA/QC <br /> All design calculations and recommendations will be reviewed by a senior <br /> principal prior to distribution to the design team or the CITY. <br /> 300.4.10 Prepare Revised Draft Geotechnical Engineering Report: <br /> The CONSULTANT shall prepare a revised draft geotechnical report for the <br /> project. This report will replace the previous draft report for the project and <br /> provide updated recommendations associated with the proposed improvements. <br /> 300.4.11 Prepare Final Geotechnical Engineering Report <br /> The CONSULTANT shall prepare a final geotechnical report for the project. This <br /> report will be revised to incorporate one round of design changes that occur after <br /> generation of the draft report. <br /> 300.4.12 Develop Geotechnical Specifications <br /> The CONSULTANT shall assist with development of required geotechnical <br /> specifications for the project. <br /> 300.4.13 Project Coordination Meetings <br /> The CONSULTANT shall participate in up to twelve (12) project coordination <br /> meetings. All meetings are assumed to be virtual and lasting 1-hour. <br /> 300.4.14 Plan and Specification Review <br /> The CONSULTANT shall review the project plans and specifications at major <br /> project milestones to ensure that all geotechnical recommendations have been <br /> incorporated. The CONSULTANT will provide review comments in the form of <br /> email to the design team. <br />
The URL can be used to link to this page
Your browser does not support the video tag.