My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 12/30/2021
>
Contracts
>
6 Years Then Destroy
>
2025
>
KPFF Consulting Engineers 12/30/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 10:26:31 AM
Creation date
1/21/2022 2:39:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
12/30/2021
Council Approval Date
12/22/2021
End Date
12/30/2025
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Later Phase Eclipse Mill Park Project
Tracking Number
0003149
Total Compensation
$600,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
KPFF Consulting Engineers 1/18/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Later Phase Eclipse Mill Project <br /> National Pollutant Ecology Clearing or grading A Notice of Intent <br /> Discharge activities resulting and related <br /> Elimination System in disturbance of materials will be <br /> (NPDES) one or more acres submitted to <br /> Construction Ecology after a <br /> Stormwater SEPA <br /> General Permit determination is <br /> (CSGP) issued <br /> Hydraulic Project Washington Work within waters An online <br /> Approval (HPA) Department of Fish of the state application will be <br /> and Wildlife submitted via the <br /> WDFW online <br /> system after a <br /> SEPA <br /> determination is <br /> issued <br /> Aquatic Use Washington State Activities proposed A JARPA <br /> Authorization Department of on or over WDNR- Attachment E will <br /> Natural Resources owned aquatic be submitted to <br /> (WDNR) lands WDNR. The CITY <br /> will coordinate any <br /> lease agreements <br /> or modifications. <br /> State CITY Activities requiring A SEPA Checklist <br /> Environmental a local agency will be submitted to <br /> Policy Act (SEPA) decision the CITY. The CITY <br /> Determination may accept a <br /> SEPA addendum to <br /> the Environmental <br /> impact Statement <br /> for the site will be <br /> negotiated in lieu of <br /> a SEPA Checklist. <br /> Shoreline CITY Activities proposed An SSDP form and <br /> Substantial within 200 feet of Shoreline Master <br /> Development the shoreline Program <br /> Permit (SSDP) environment buffer compliance <br /> analysis will be <br /> submitted to the <br /> CITY, <br /> Critical Areas CITY Activities proposed A Critical Areas <br /> Ordinance within designated Report will be <br /> Compliance critical areas submitted to the <br /> CITY with the <br /> SEPA Checklist <br /> Floodplain Code CITY Work within a A No Rise Memo <br /> Compliance designated (prepared by <br /> floodplain others) will <br /> accompany an <br />
The URL can be used to link to this page
Your browser does not support the video tag.