Laserfiche WebLink
Table 1-2.5.1 On-Site Stormwater Management Requirements for <br /> Projects Triggering Minimum Requirements #1 - #9 <br /> Project Type and Location Requirement <br /> Low Impact Development Performance <br /> New development on any parcel inside Standard and BMP T5.13: Post-Construction <br /> the UGA, or new development outside the Soil Quality and Depth (p.911); or List#2 <br /> UGA on a parcel less than 5 acres (applicant option). <br /> New development outside the UGA on a Low Impact Development Performance <br /> parcel of 5 acres or larger Standard and BMP T5.13: Post-Construction <br /> Soil Quality and Depth (p.911). <br /> Low Impact Development Performance <br /> Redevelopment on any parcel inside the Standard and BMP T5.13: Post-Construction <br /> UGA, or redevelopment outside the UGA Soil Quality and Depth (p.911); or List#2 <br /> on a parcel less than 5 acres (applicant option). <br /> Redevelopment outside the UGA on a par-Low Impact Development Performance <br /> Standard and BMP T5.13: Post-Construction <br /> cel of 5 acres or larger Soil Quality and Depth (p.911). <br /> Note: This table refers to the Urban Growth Area (UGA) as designated under the <br /> Growth Management Act(GMA) (Chapter 36.70A RCW)of the State of Washington. If <br /> the Permittee is located in a county that is not subject to planning under the GMA, the <br /> city limits shall be used. <br /> Low Impact Development Performance Standard <br /> Stormwater discharges shall match developed discharge durations to pre- <br /> developed durations for the range of pre-developed discharge rates from 8% of <br /> the 2-year peak flow to 50% of the 2-year peak flow. Refer to the Standard Flow <br /> Control Requirement section in Minimum Requirement#7 for information about <br /> the assignment of the pre-developed condition. Project sites that must also meet <br /> minimum requirement#7 —flow control - must match flow durations between 8% of <br /> the 2-year flow through the full 50-year flow. <br /> List #1: On-site Stormwater Management BMPs for Projects Triggering <br /> Minimum Requirements #1 through #5 <br /> For each surface, consider the BMP's in the order listed for that type of surface. <br /> Use the first BMP that is considered feasible. No other On-site Stormwater Man- <br /> agement BMP is necessary for that surface. Feasibility shall be determined by eval- <br /> uation against: <br /> 1. Design criteria, limitations, and infeasibility criteria identified for each BMP in <br /> this manual; and <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume I- Chapter 2 -Page 56 <br /> 9 <br />