Laserfiche WebLink
• 0 <br /> MI <br /> CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> November 18, 2019 CN\S <br /> Ownert) h1/4(V-.• (4,6 ec oc.e.c_c_. <br /> 2_-) fi_cazi Flirokfz__. --01--t el t-2- <br /> Nguyen ,/ <br /> Job Address: 2217 Madison St. 5-) �<�T or2 M i-.) = A-f r iG <br /> Plan Check No: CW1907-001 <br /> RE: Building Permit Review Letter <br /> Dear Mr. Nguyen, <br /> In response to the application for a building permit,the plans have been examined and you are advised that <br /> 1 revisions are necessary before a permit can be issued. Please review and respond to the comments below. <br /> W 1. Provide section and/or details specific to this structure,for each different wall type, including but <br /> not limited to, <br /> 1 . the wall between the garage and the house showing R-10 rigid insulation on the garage side with <br /> 1 protection from impact. <br /> (-:Indicate flame spread and smoke development requirements for exposed insulation. <br /> ) New interior framed partitions <br /> (:,.-New one-hour fire-resistance rated interior framed partitions. r-pti A. 176, S <br /> A <br /> 2 ..ENew furred walls at interior concrete walls. <br /> )fProvide fire blocking at not more than 10' O.C. horizontal and vertical show fireblocking on detail). <br /> Neu Provide section and/or details for construction of the new deck and roof. <br /> Provide gravity calculations for the posts supporting the new deck and roof. <br /> ,> Provide minimum 30 inch clear working clearance in front of the electrical panel. <br /> P` Show location of the electrical panel for the circuits on the main floor of the residence. <br /> Ramps serving the egress door required by section R311.2 shall have a slope of not more than 1 unit <br /> tJr,4-4 al_ <br /> (a vertical in 12 units horizontal.All other ramps shall have a maximum slope of 1 unit vertical in 8 <br /> f + 3 611 L 4units horizontal.The ramps as shown appear to exceed the maximum allowed slope. <br /> aga . Show how the furnaces and water heaters are provided with combustion air. <br /> 1�� y he "Fire Separation Floor Assembly"specified on sheet 5 of the plans does not satisfy the <br /> (� requirement for a one-hour fire-resistance rated assembly as specified in section R302.3 IRC, <br /> specifically the existing floor system does not have 2x10 joists.After a discussion with the Building <br /> Official, it has been determined that the use of GA File No. RC 2602 with the addition of resilient <br /> furring channels applied at right angles to joists at 16" O.C.w/6d coated nails,1-7/8" long, 0.085" <br /> shank N" heads,two per joist, (for noise transmission reduction)would be an acceptable assembly <br /> for the separation between dwelling units. <br /> ( Pagel of 2 ) <br />