My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 11:55:14 AM
Creation date
1/25/2022 8:36:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST — EVERETT CONTRACTOR'S YARD INTERIM FILL PROJECT Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,733 <br />' BMP C123: Plastic Covering <br />Purpose <br />' Plastic covering provides immediate, short-term erosion protection to slopes and dis- <br />turbed areas. <br />Conditions of Use <br />' Plastic covering may be used on disturbed areas that require cover measures for less <br />than 30 days, except as stated below. <br />' . Plastic is particularly useful for protecting cut and fill slopes and stockpiles. Note: <br />The relatively rapid breakdown of most polyethylene sheeting makes it unsuitable <br />for long-term (greater than six months) applications. <br />. Due to rapid runoff caused by plastic covering, do not use this method upslope of <br />areas that might be adversely impacted by concentrated runoff. Such areas include <br />steep and/or unstable slopes. <br />' . Plastic sheeting may result in increased runoff volumes and velocities, requiring <br />additional on -site measures to counteract the increases. Creating a trough with <br />wattles or other material can convey clean water away from these areas. <br />' . To prevent undercutting, trench and backfill rolled plastic covering products. <br />. While plastic is inexpensive to purchase, the added cost of installation, main- <br />tenance, removal, and disposal make this an expensive material, up to $1.50-2.00 <br />per square yard. <br />. Whenever plastic is used to protect slopes install water collection measures at the <br />base of the slope. These measures include plastic -covered berms, channels, and <br />pipes used to covey clean rainwater away from bare soil and disturbed areas. Do <br />not mix clean runoff from a plastic covered slope with dirty runoff from a project. <br />. Other uses for plastic include: <br />1. Temporary ditch liner. <br />' 2. Pond liner in temporary sediment pond. <br />3. Liner for bermed temporary fuel storage area if plastic is not reactive to the <br />type of fuel being stored. <br />4. Emergency slope protection during heavy rains. <br />5. Temporary drainpipe ("elephant trunk") used to direct water. <br />' 2014 Stormwater Management Manual for Westem Washington <br />' Volume II - Chapter 4 - Page 294 <br />SITTS & HILL ENGINEERS, INC. 41 <br />' TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.