My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 11:55:14 AM
Creation date
1/25/2022 8:36:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTER WEST — EVERETT CONTRACTORS YARD INTERIM FILL PROJECT Sitts & Hill Engineers, Inc. <br />' CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,733 <br />Design and Installation Specifications <br />' Plastic slope cover must be installed as follows: <br />1. Run plastic up and down slope, not across slope. <br />2. Plastic may be installed perpendicular to a slope if the slope length is less <br />than 10 feet <br />' 3. Minimum of 84nch overlap at seams. <br />4. On long or wide slopes, or slopes subject to wind, tape all seams. <br />5. Place plastic into a small (12-inch wide by 6-inch deep) slot trench at the top <br />of the slope and backfill with soil to keep water from flowing underneath. <br />6. Place sand filled burlap or geotextile bags every 3 to 6 feet along seams and <br />be them together with twine to hold them in place. <br />7. Inspect plastic for rips, tears, and open seams regularly and repair imme- <br />diately. This prevents high velocity runoff from contacting bare soil which <br />' causes extreme erosion. <br />8. Sandbags may be lowered into place tied to ropes. However, all sandbags <br />must be staked in place. <br />' - Plastic sheeting shall have a minimum thickness of 0.06 millimeters. <br />- If erosion at the toe of a slope is likely, a gravel berm, riprap, or other suitable pro- <br />tection shall be installed at the toe of the slope in order to reduce the velocity of run- <br />off. <br />Maintenance Standards <br />- Tom sheets must be replaced and open seams repaired. <br />- Completely remove and replace the plastic if it begins to deteriorate due to ultra- <br />violet radiation. <br />- Completely remove plastic when no longer needed. <br />' - Dispose of old tires used to weight down plastic sheeting appropriately. <br />Approved as Equivalent <br />Ecology has approved products as able to meet the requirements of BMP C123: Plastic <br />Covering. The products did not pass through the Technology Assessment Protocol — <br />Ecology (TAPE) process. Local jurisdictions may choose not to accept this product <br />approved as equivalent, or may require additional testing prior to consideration for local <br />' use. The products are available for review on Ecology's website at <br />httpJ/www.ecy.wa.gov/programs/wq/Stormwater/newtech/eguivalent.htmi <br />2014 Stormwater Management Manual for Western Washington <br />Volume 11- Chapter 4 - Page 295 <br />SITTS & HILL ENGINEERS, INC. 42 <br />' TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.