My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 11:55:14 AM
Creation date
1/25/2022 8:36:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST — EVERETT CONTRACTOR'S YARD INTERIM FILL PROJECT Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWA TER POLLUTION PREVENTION PLAN Job Number 17,733 <br />BMP C14O: Dust Control <br />Purpose <br />Dust control prevents wind transport of dust from disturbed soil surfaces onto roadways, <br />drainage ways, and surface waters. <br />Conditions of Use <br />In areas (including roadways) subject to surface and air movement of dust where <br />on -site and off -site impacts to roadways, drainage ways, or surface waters are <br />likely. <br />Design and Installation Specifications <br />. Vegetate or mulch areas that will not receive vehicle traffic. In areas where plant- <br />ing, mulching, or paving is impractical, apply gravel or landscaping rock. <br />. Limit dust generation by clearing only those areas where immediate activity will <br />take place, leaving the remaining area(s) in the original condition. Maintain the ori- <br />ginal ground cover as long as practical. <br />. Construct natural or artificial windbreaks or windscreens. These may be designed <br />as enclosures for small dust sources. <br />. Sprinkle the site with water until surface is wet Repeat as needed. To prevent <br />carryout of mud onto street, refer to BMP C105: Stabilized Construction Entrance I <br />Exit (p.270). <br />. Irrigation water can be used for dust control. Irrigation systems should be installed <br />as a first step on sites where dust control is a concern. <br />Spray exposed soil areas with a dust palliative, following the manufacturer's <br />instructions and cautions regarding handling and application. Used oil is pro- <br />hibited from use as a dust suppressant Local governments may approve other <br />dust palliatives such as calcium chloride or PAM. <br />. PAM (BMP C126: Polyacrylamide (PAM) for Soil Erosion Protection (p.300)) <br />added to water at a rate of 0.5 lbs. per 1,000 gallons of water per acre and applied <br />from a water truck is more effective than water alone. This is due to increased infilt- <br />ration of water into the soil and reduced evaporation. In addition, small soil <br />particles are bonded together and are not as easily transported by wind. Adding <br />PAM may actually reduce the quantity of water needed for dust control. Use of <br />PAM could be a cost-effective dust control method. <br />' Techniques that can be used for unpaved roads and lots include: <br />' 2014 Stormwater Management Manual for Westem Washington <br />Volume 1f - Chapter4 - Page 310 <br />SITTS & HILL ENGINEERS, INC. 43 <br />TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.