My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 11:55:14 AM
Creation date
1/25/2022 8:36:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'UBLIORKS PERMIT <br />Date Applied: <br />7/30/2018 <br />City of Everett Permit Services <br />Public Works Permit #: <br />PW1807-046 <br />3200 Cedar Street, 2nd Floor Associated Bldg Permit #: <br />Everett, WA 98201 <br />Planning Reference #: <br />SEPA18-005 <br />(425) 267-8810 <br />Public Works Fee: <br />$925.00 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />INTERWEST CONSTRUCTION INC <br />INTERWEST CON RUCTION INC <br />609 NORTH HILL BLVD <br />609 NORTH HILL LVD <br />BURLINGTON, WA, 98233 <br />BURLINGTON, A, 98233 <br />PHONE:3608999628 <br />PHONE:360 99628 <br />TAX PARCEL ID #: 29052100201000 <br />SITE ADD ESS: 2320 RAILWAY AVE <br />DESCRIPTION: FILL AND GRADING AT PROPOSED CONTRACTORYARD-ICI <br />THIS PERMIT TO BE POSTED ONJOB OB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit an urrent City of Everett'Design and Construction Standards <br />and Specifications for Development'. <br />3. Call Location Underground Service 48 hours b re you d' . The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans and drains re o pproved by the City of Everett Public Works Department dated <br />3/29/2019. Approved plans must remain on job -site es. <br />5. It is the applicant/contractor's respopsibility en r coverage under Ecology's Construction Stormwater General Permit <br />is obtained and maintatined throughout the en re c n ruction duration. <br />6. Inspections are required for all stages of o u on. Visit the City's Online Permitting Portal at pw.everettwa.gov to <br />formally request all required inspections. FI s provided at permit issuance with instructions on how to request an <br />inspection online. <br />7.Only vehicles required for the construct o is fill and grade permit will be permitted onsite during the duzetiorr'�bis <br />permit. Vehicle storage other tha a c ssary for the construction of the scope within this-perftTt'-is =5§iderad <br />business practices and will not b e mi ntil the associated construction permit is ap ye(�apdi-. completed for the <br />creation of the construction yard. us' ss activities can occur until all permits have bed issued ghffolon ttuction to <br />r .> ,i', �.-, r., <br />completion to create the full site impr e ents required. cr.) ----12 �- r=r <br />8. Concrete crushing/fill processing is n permitted onsite under the scope of this permit. All equipment assoiAted.,w �i this <br />work shall be removed from the site if resent at an time until the appropriate ermits have been issued to &mit * ` -se <br />Yp p t�: <br />and presence on the site including a roved noise studies and mitigation measures installed. <br />9. Fill material shall match that spe fied on the plans and in the SEPA Checklist.a <br />10. Obtain a Temporary Construc on Easement from City of Everett Real Property prior to removal on City of Everett"c <br />b - <br />property. 41, <br />11. This permit must be finaled n order to close out this permit/grant a Certificate of Occu�i�r.Y;eWt,:�a final inspection <br />online by selecting PW-Site F' al within the Online Permitting Portal Inspection Requests i0�:'all,jfe Yaave been.,,' <br />completed for this permit. <br />Public Works Permit Fe Breakdown: -� <br />....................$200.00 <br />Erosion Control.........../,�03CY) <br />Grade/Fill/Excavate (4 .............$685.00 APR 01 2019 <br />PW Plan Review.......................................$20.00 <br />PW Site Inspection....................................$20.00 CITY OF EVEIRETT <br />City of Everett Official Use Only ACKNOWLEDGEMENT OF CBf Mffi8*rVICe$ <br />The undersigned owner/applicant hereby agrees to hold and save <br />harmless the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation and <br />maintenance of the improvement or other right-of-way use here to applied <br />Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br />replace public rty damaged thereby. <br />�r r� <br />FINAL INSPECTION Date <br />Approved as Constructed (PW Inspector) of Ap , c t Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLEfEION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />F/LIC <br />
The URL can be used to link to this page
Your browser does not support the video tag.