Laserfiche WebLink
EVERETT <br />WASHINGTON <br />PUBLIC WORKS PERMIT <br />City of Everett Permit Services <br />3200 Cedar Street, 2"d Floor <br />Everett, WA 98201 <br />425-257-8810 <br />Date Applied: 7/30/2018 <br />Public Works Permit #: PW1807-046 <br />Associated Bldg Permit #: <br />Planning Reference #: SEPA18-005 <br />Public Works Fee: $20.00 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />INTERWEST CONSTRUCTION INC <br />INTERWEST CONSTRUCTION INC <br />609 NORTH HILL BLVD <br />609 NORTH HILL BLVD <br />BURLINGTON, WA, 98233 <br />BURLINGTON, WA, 98233 <br />PHONE: 3608999628 <br />PHONE: 3608999628 <br />TAX PARCEL ID #: 29052100201000 <br />SITE ADDRESS: 2320 RAILWAY AVE <br />DESCRIPTION: FILL AND GRADING AT PROPOSED CONTRACTOR YARD -ICI <br />REVISION (4-26-2019) TO INCLUDE CONCRETE CRUSHER FOR FILL PROCESSING AS A CONSTRUCTION ACTIVITY FOR THE SCOPE OF THIS <br />PERMIT. HOURS MUST COMPLY WITH THE CITY'S NOISE ORDINANCE AND LETTER ISSUED BY ICI DATED 4/16/2019. <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and Specifications for <br />Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated 3/29/2019. Approved <br />plans must remain on job -site at all times. <br />5. It is the applicant/contractor's responsibility to ensure coverage under Ecology's Construction Stormwater General Permit is obtained and <br />maintatined throughout the entire construction duration. <br />6. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all required <br />inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br />7. Only vehicles required for the construction of this fill and grade permit will be permitted onsite during the duration of this permit. Vehicle storage <br />other than what is necessary for the construction of the scope within this permit is considered business practices and will not be permitted until the <br />associated construction permit is approved and work completed for the creation of the construction yard. No business activities can occur until all <br />permits have been issued and construction to completion to create the full site improvements required. I"''i <br />8. Concrete crushing/fill processing is now permitted onsite under the scope of this permit revision dated 4/26/2019. Concrete crushing Uncl&.this <br />permit is only allowed for fill on this property. No business use or hauling of crushed material off -site is permitted untljfecor;IS€ructipn is complete <br />with the appropriate permits are in place, constructed to completion, finaled by the inspector, and is compliance with th earirj ExarYiiner's <br />approval (including noise study and mitigation). <br />9. Fill material shall match that specified on the plans and in the SEPA Checklist. <br />10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by 961ecti�g,40lltf- <br />Site Final within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br />Public Works Permit Fee Breakdown: (paid on 4/1/2019) <br />Erosion Control.......................................$200.00 <br />Grade/Fill/Excavate (43,403CY)..............$685.00 t:::� s:','I; +_ ,•...,., <br />PW Plan Review.......................................$20.00 <br />PW Site Inspection...................................$20.00 <br />;...... `,r;5 <br />PW Plan Review (Revisions) ...................... $20.00 <br />City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless <br />the City of Everett from any and all claims for damages, costs, expenses, or <br />causes of action that may arise because of installation and maintenance of <br />Approved for Construction (Public Works) Date the improvement or other right-of-way use here to applied for and further <br />agrees to remove same upon notice from the City and to replace public <br />prope ged thereby. <br />��7_ <br />FINAL INSPECTION Date <br />Approved as Constructed (PW Inspector) n ure of licant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETEION. THIS PERMIT MAYBE CANCELLED BY <br />THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION. EACH INSPECTION EXTENDS THE EXPIRATION DATE 18 TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />