My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 11:55:14 AM
Creation date
1/25/2022 8:36:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTER WEST — EVERETT CONTRACTOR'S YARD INTERIM FILL PROJECT Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,733 <br />Figure 3 - Public Works Director Interim Policy for Stormwater Control in the Combined Sewer Area <br />PUBLIC WORKS DIRECTOR INTERIM POLICY <br />Stormwefer Control in the Combined Sewer Area <br />Public Works Policy #: 2-11 Supersedes Policy # 141 <br />SUBJECT: Stormwater control in the combined sewer area. <br />The combined sewer area shall be that described in the attached map or as updated by <br />City of Everett Public Works Utility Mapping. <br />BACKGROUND: Heavy storm events have caused localized surcharges in the City's <br />combined sewer system, fading basements and streets in North Everett. This flooding. <br />has been disruptive for citizens, causing damage to homes, creating health concerns, <br />and imposing a financial burden on the rate -based utility. Controlling stormwater <br />discharges, to the combined sewer system would mitigate these impacts. <br />EMC 14.56.020 authorizes the Public Works director to adopt rules and procedures to <br />implement chapters 14.56, Surface Water System, and 14.28, Surface and Storm <br />Drainage. Pursuant to that authority, this policy modifies the City's Design and <br />Construction Standards and Specifications (Section 4: Storm and Surface Water) and <br />the City's 2010 Stormwater Management Manual by making application of the <br />stormwater manual mandatory in the combined sewer area. <br />EMC 14.08.135.A.3 authorizes the Director to establish rules for the administration of <br />the sewer connection fees established by EMC 14.08.135.A.1, EMC 14.08.135.A.4 <br />provides a basis far the exercise of the ClWs $EPA, authority to require mitigation to <br />supplement other code requirements. The director in this policy exercises the authority <br />granted by EMC 14.08.135,A.1, A.3, and AA to provide a credit against the sewer <br />connection fee for the cost of stormwater controls that are in addition to those set forth <br />in the Stormwater Management Manual. <br />s_1#Op1 n301�VCl�ri f inn misfcr�rnavater interim Pdicy (6).docx <br />CITY OF EVERETT • 3200 Cedar Street - Everett, WA 98201 - (425) 257-8800 • Fax (425) 257-8882 <br />r <br />SITTS & HILL ENGINEERS, INC. 7 <br />TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.