My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 11:55:14 AM
Creation date
1/25/2022 8:36:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTER WEST — EVERETT CONTRACTOR'S YARD INTERIM FILL PROJECT Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,733 <br />Figure 3 cont. - Public Works Director Interim Policy for Stormwater Control in the Combined Sewer Area <br />INTERIM POLICY: The following interim policy shall apply to all new development and <br />redevelopment that creates and/or redevelops a total of 2,000 sq. ft. or more of <br />impervious area: <br />1. Stormwater in the combined sewer area shall be controlled according to <br />the requirements in the CiVe 2010 Stormwater Management Manual, with <br />the exception of Minimum Requirement #6 — Runoff Treatment and in <br />Minimum Requirement #7 — Flaw Control, the term "a forested land cover" <br />shall be replaced by 'lhe existing site conditions', provided that the <br />resulting stormwater flow shall not increase Combined Sewer Overflows <br />(CSOs) andlor basement flooding in the combined sewer area. <br />2. The cost of stormwater controls that are required in addition to <br />requirements of the Stormwater Management Manual will be credited <br />against the projects sewer connection charge (EMC 14.08.135). The <br />amount credited shall be based on a bid amount for the additional controls <br />provided to the City by the developer. <br />1 3. No connections of roof drains to side sewers or laterals shall be allowed <br />without prior approval of the Director. <br />DURATION OF INTERIM POLICY, <br />This policy applies to all applications for project permits submitted after the effective <br />date of the policy. See EMC 15.28.010. The polio shall take effect on the date the <br />Director signs it and remain in effect until the date the Director terminates it in writing or <br />issues a pbliicy expressly 'superseding this Interim policy. The Director intends to review <br />this interim policy upon the update of the Comprehensive Sewer Plan in approximately <br />one year and to revise the policy if warranted by the updated plan. <br />/hj/Signed: Date:� <br />David H. Davis, P.E., Public Works Director <br />5=L#tA�ttmtsr11Ct6alt ryl�ri C lStaitriW Set inert M POWY (6).dOCX <br />SITTS & HILL ENGINEERS, INC. 8 <br />TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.