My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 11:55:14 AM
Creation date
1/25/2022 8:36:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTER WEST — EVERETT CONTRACTOR'S YARD INTERIM FILL PROJECT Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,733 <br />Element 4- Install Sediment Controls <br />Silt fencing will be provided along the entire perimeter of the site. A temporary sediment pond is also <br />proposed and has been sized according to the requirements of the DOE Manual. See Section 10 for <br />sizing calculations. <br />Applicable BMPs: BMP C233: Silt Fence <br />BMP C241: Temporary Sediment Pond <br />Element 5- Stabilize Soils <br />Any exposed soil requiring stabilization due to poor weather conditions, or left unworked for more than <br />2 days from October 1 to April 30 Q days from May 1 to September 30), will be covered at the end of <br />each work shift. Covering material will be anchored to ensure adequate protection. Erosion control <br />measures will remain in place until soil stabilization can be achieved by the installation of permanent <br />surfacing. There will be no soil stockpiles after construction. Dust control will be utilized as necessary at <br />the Contractor's discretion by keeping the work area adequately moisture conditioned. <br />Applicable BMPs: BMP C120: <br />Temporary and Permanent Seeding <br />BMP C121: <br />Mulching <br />BMP C123: <br />Plastic Covering <br />BMP C140: <br />Dust Control <br />Element 6- Protect Slopes <br />Any destabilized slopes are to be protected from erosion as described in Element 5 — Stabilize Soils. <br />Applicable BMPs: BMP C120: Temporary and Permanent Seeding <br />BMP C121: Mulching <br />BMP C123: Plastic Covering <br />Element 7- Protect Drain Inlets <br />The project site will not contain any existing or proposed drain inlets in the interim fill condition. Should <br />any existing drain inlets be encountered adjacent to the earthwork activities, catch basin protection shall <br />be provided. <br />Applicable BMPs: BMP C220: Storm Drain Inlet Protection <br />Element 8- Stabilize Channels and Outlets <br />Conveyance channels are proposed to manage stormwater in the interim site condition. The use of <br />channels during construction to carry construction stormwater is depicted on the erosion control plan. <br />SITTS & HILL ENGINEERS, INC. 16 <br />TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.