Laserfiche WebLink
INTERWEST — EVERETT CONTRACTOR'S YARD INTERIM FILL PROJECT Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,733 <br />Channels are designed and protected in accordance with all applicable requirements of the DOE Manual <br />and the City of Everett. Any outlet that may convey runoff during construction shall be stabilized. <br />Applicable BMPs: BMP C209: Outlet Protection <br />Element 9- Control Pollutants <br />All material to be removed/demolished will be disposed of at an approved off -site location. Fueling and <br />lubrication of construction vehicles and other motorized equipment will occur only at approved off -site <br />facilities. Construction equipment will be inspected daily as part of regular maintenance activities. Any <br />leaks or other sources of contamination will be repaired immediately. Spillage or other discharges of <br />pollutants will be reported within 24 hours. Also, the contractor will maintain any materials necessary <br />for rapid cleanup of spills. <br />BMP'S TO CONSIDER FOR ALL ACTIVITIES <br />Suggested BMPs include: <br />1) Avoid the activity or reduce its occurrence. <br />2) Sweep an indoor or outdoor work area instead of hosing it into the storm drain or other <br />drainage conveyance. <br />3) Store items inside if possible. <br />4) Use less material. Don't buy or use more material than you really need. <br />5) Use the less toxic materials available. Investigate the use of materials that are less toxic than <br />what you use now. Perhaps a caustic type detergent or a solvent could be replaced with a <br />more environmentally friendly product. <br />6) Maintain vegetated areas near activity locations. <br />7) Locate activities as far as possible from surface drainage paths. Activities located as far as <br />possible from known drainage paths, ditches and drains will be less likely to pollute, since it <br />will take longer for material to reach drainage features. <br />8) Keep storm drainage systems clean. <br />9) Be an advocate for stormwater pollution prevention. Help friends, partners and business <br />associates find ways to reduce stormwater pollution in their activities. <br />Applicable BMPs: BMP C153: Material Delivery, Storage and Containment <br />Element 10- Control De -Watering <br />' It is not anticipated that dewatering will be included as a part of this project. However, should it become <br />necessary, the disposal of dewatering water shall be performed in accordance with the requirements of <br />the DOE and the City of Everett. Contaminated water must be treated onsite by DOE -approved chemical <br />means, transported offsite for legal disposal in a manner that does not pollute state waters, or <br />discharged to the sanitary or combined sewer system with approval from the City (if the first two <br />options are not viable). If necessary, a Sewer Discharge Authorization Permit may be able to be obtained <br />SITTS & HILL ENGINEERS, INC. 17 <br />TACOMA, WASHINGTON <br />