Laserfiche WebLink
INTERWEST — EVERETT CONTRACTOR'S YARD INTERIM FILL PROJECT <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN <br />Figure 11-4.1.1 Stabilized Construction Entrance <br />d <br />�,St�r9R°a <br />Install driveway <br />culvert it there is a <br />roadside ditch present <br />Notes: <br />1. Driveway shall meet <br />the requirements of the <br />Permitting agency. <br />2. It is recommended that <br />the entrance be <br />crowned so that runoff <br />drains off the pad. <br />4"•Vqua" <br />spalls <br />Gootextile <br />12' minimum Thickness <br />Sitts & Hill Engineers, Inc. <br />Job Number 17,733 <br />NOT TO SCALE <br />Figure II-4.1.1 <br />Stabilized Construction Entrance <br />DEPARTMENT OF Revised Juno2015 <br />ECOLOGY Please see hGp:IM.,,..W.,.. gov/eopyrighthtrrd for copyright notice including permissions. <br />State of Washington limitation of liability. and disclaimer. <br />2014 Stonnwater Management Manual for Western Washington <br />Volume it - Chapter 4 - Page 273 <br />SI1TS & HILL ENGINEERS, INC. 28 <br />TACOMA, WASHINGTON <br />