Laserfiche WebLink
I • <br /> Envelope Summary ENV-SUM <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Oct 2017 <br /> Project Info Project Title: TSI Aviation Date 03/17/2020 <br /> Applicant Info. Company Name: Lance Mueller&Associates For Building Department Use <br /> Provide contact Company Address: 130 Lakeside Ste 250 Seattle,WA 98122 <br /> information for <br /> individual who can Applicant Name: Harold Christensen <br /> respond to inquiries <br /> about information Applicant Phone: 206-325-2553 <br /> provided. Applicant Email: HaroldC@Imueller.com <br /> Project Description ❑ New Building ❑ Addition ❑.r Alteration ❑ No Envelope Scope <br /> Envelope Project Scope Q All Commercial ❑ Group R-Commercial ❑ Mixed Use-Commercial+Group R <br /> Select all that apply. <br /> ❑ Semi-heated ❑ Refrigerated Cooler ❑ Refrigerated Freezer ❑ Equipment Building <br /> Envelope Description <br /> Provide brief description of the project and <br /> relevant supporting documentation. <br /> If project includes multiple Target Insulation <br /> Allowance areas,and/or is demonstrating <br /> compliance as an Addition+Existing, <br /> Alteration+Existing,or <br /> Addition+Alteration +Existing project, <br /> provide a brief summary of the approach to <br /> whole building compliance. <br /> Air Barrier Testing 0 Air barrier testing per Section C402.5.1.2 included in project scope <br /> Air barrier testing is required for all new <br /> construction projects. Testing criteria is 0.40 ❑Additional Efficiency Package Option-C406.9 Reduced Air Infiltration <br /> cfm/ft2 under test pressure of 0.3 inch w.g. <br /> To comply with C406.9,demonstrate that El Testing not required. Explanation: <br /> measured air leakage of building envelope <br /> Compliance Documentation Scope and Method <br /> Scope of This Calculation ❑ New Building ❑ Addition Q Alteration ❑ No Envelope Scope <br /> Target Insulation Allowance Q Fully Conditioned-Commercial,Group R,Mixed Use <br /> Sets the title and calculations in the <br /> compliance forms.Selection required Q Semi-heated Q Refrigerated Cooler 0 Refrigerated Freezer <br /> to enable forms. If project includes more than one Target Insulation Allowance area,and/or if project includes <br /> addition and alteration areas complying independently,for each area complete an ENV-SUM form <br /> Rows 16-46 and either an ENV-PRESCRIPTIVE form,or ENV-UA+ENV-SHGC forms if <br /> demonstrating compliance via component performance. <br /> Envelope Compliance Path <br /> 0 Prescriptive 0 Component Performance <br /> Selection required to enable forms. <br /> Component Performance 0 Change of Occupancy(C503.2)/Conditioning(C505)-10%higher UA allowed <br /> Calculation Adjustments ❑ Additional Efficiency Package Option-C406.8 Enhanced Envelope-15%lower UA required <br /> Additions Q Addition stand alone Q Addition+Existing <br /> Addition stand alone-Complete Vertical Fenestration and Skylight Area Calculation.Enter total existing-to-remain wall,roof, vertical <br /> fenestration and skylight areas as EXISTING.Enter total addition envelope assembly areas as NEW.If resulting total building WWR exceeds <br /> 30%and/or SSR exceeds 5%,refer to C502.2.I and C502.2.2 for prescriptive compliance alternatives.If complying via component performance, <br /> complete ENV-UA per instructions for addition stand alone projects. <br /> Addition+existing-Complete ENV-UA per instructions for addtion+existing projects. <br /> Alterations- riReplacement windows only,or resulting ❑ Total building WWR increased by alteration <br /> Fenestration and Skylight total building WWR original WWR <br /> rai Replacement skylights only,or resulting ❑ Total building SRR increased by alteration <br /> Total building SRR<_original SRR <br /> WWR and SRR not increased-Vertical Fenestration and Skylight Area Calculation not required. <br /> WWR and/or SRR increased-Complete Vertical Fenestration and Skylight Area Calculation.Enter total existing-to-remain wall,roof,vertical <br /> fenestration and skylight areas as EXISTING.Enter total altered envelope assembly areas as NEW If resulting total building WWR exceeds 30% <br /> and/or SSR exceeds 5%,refer to C503.3.2 and C503.3.3 for prescriptive compliance alternatives.If complying via component performance, <br /> complete ENV-UA per instructions for alteration+existing projects. <br />