My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6200 23RD DR W TSI SEATS 2022-01-26
>
Address Records
>
23RD DR W
>
6200
>
TSI SEATS
>
6200 23RD DR W TSI SEATS 2022-01-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 2:52:56 PM
Creation date
1/25/2022 11:01:16 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
6200
Tenant Name
TSI SEATS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> Envelope Summary, pg. 2 ENV-SUM <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Oct 2017 <br /> Project Title: TSI Aviation Date 03/17/2020 <br /> Vertical Fenestration and Total Vertical NET Exterior <br /> Fenestration Area Above Grade Total Skylight Area NET Exterior Roof <br /> Skylight Area Calculation (rough opening) Wall Area (rough opening) Area <br /> Prescriptive Path-Enter envelope sf values New 986 18,221 512 37,929 <br /> directly into this section of ENV-SUM for <br /> vertical fenestration,skylights,net walls and Existing 0 0 0 0 <br /> roof.For Additions and Alterations,refer to <br /> these sections in ENV-SUM for further instructions. Total 986 18,221 512 37,929 <br /> Component Performance-When this <br /> Envelope Compliance Path is selected,write- Vertical <br /> protection of this section is enabled.Enter o Skylight-to-Roof o <br /> envelope sf values for all assemblies into the Fenestration-to- 5.1% Ratio(SRR) 1.3/o <br /> ENV-UA form.Envelope information from Wall Ratio(WWR) <br /> ENV-UA will auto-fill into this section of ENV- <br /> Vertical Fenestration Area Compliance VERTICAL FENESTRATION AREA COMPLIES WITH MAXIMUM ALLOWANCE <br /> Skylight Area Compliance SKYLIGHT AREA COMPLIES WITH MAXIMUM ALLOWANCE <br /> Vertical Fenestration 0 High performance fenestration U-factors and SHGC per C402.4.1.3 <br /> Alternates Q Dedicated outdoor air system per C402.4.1.4 and C403.6 <br /> Show locations of qualifying daylight zone Q In buildings z 3 stories,25%or more of NET floor area is in DLZ per C402.4.1.1 <br /> (DLZ)areas and ft2 on project plans. <br /> 0 In buildings<3 stories,50%or more of CONDITIONED floor area is within DLZ per C402.4.1.1 <br /> For Daylight Zone Area Calculations- Daylight Zone Calculations <br /> a)Sidelight areas include primary+ <br /> secondary daylight zone areas. Daylight Zone Fenestration Alternate Sidelight Daylight Toplight Daylight Percent Daylight <br /> b)Include overlapping toplight and sidelight Not Selected.No Calculations Required Zone Area Zone Area Zone Area <br /> daylight zone areas under Toplight. <br /> c)Net floor area definition in Chapter 2. <br /> Spaces in Single Story List all enclosed spaces that exceed 2,500 ft2,have ceiling height greater than 15 ft,and are space <br /> Building Requiring Skylights types required to comply with this provision.Indicate aperture with"AP"prefix(AP 1.1%) <br /> In these spaces a minimum of 50%of the Space Space Area(ft2) DLZ Area(ft2) SRR or Aperture Exception <br /> floor area shall be within a skylight daylight <br /> zone(DLZ).Refer to C402.4.2 for <br /> requirements. <br /> SRR=Skylight to roof ratio <br /> Envelope Exemptions <br /> Low Energy and Semi-heated Low energy spaces per C402.1.1 Item 1 are exempt from the thermal envelope provisions.Semi- <br /> heated spaces heated by systems other than electric resistance are exempt from wall insulation <br /> Spaces provision only per C402.1.1.1. <br /> Complete Low Energy and Semi-Heated Spaces table in MECH-SUM to verify eligibility based on <br /> installed peak heating and cooling capacity per sf. <br /> Equipment Buildings Wall Insulation Roof Insulation Overall Average <br /> R-Value R-Value U-Factor <br /> Equipment buildings are exempt from the Equipment Building Envelope <br /> thermal envelope provisions per C402.1.2. <br /> The following shall be met to be eligible: Electronic equipment power(watts/sf) <br /> building size<_500 sf,average wall/roof U- Heating system output capacity(Btu/hr) <br /> factor 5 U-0.20,electronic equipment load>_ <br /> 7 watts/sf,heating system output capacity 5 Cooling capacity(Yes/No) <br /> 17,000 btu/h.Cooling system capacity not <br /> limited. <br />
The URL can be used to link to this page
Your browser does not support the video tag.