My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
600 RIVERSIDE RD 2022-01-25
>
Address Records
>
RIVERSIDE RD
>
600
>
600 RIVERSIDE RD 2022-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 1:20:04 PM
Creation date
1/25/2022 11:41:01 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
600
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2 Proposed Construction Activities <br />Description of site development (example: subdivision): <br />The project proposes 2,690 linear feet of 10 feet wide asphalt concrete shared use path with <br />associated landscape improvements. <br />Description of construction activities (example: site preparation, demolition, excavation): <br />Construction will consist of clearing, grubbing, site grading and paving. <br />Description of site drainage including flow from and onto adjacent properties. Must be consistent <br />with Site Map in Appendix A: <br />The site currently drains toward the Snohomish River though a series of low points along the <br />shoreline. This project maintains those low points and mimics the natural discharge locations. <br />Some localized areas have been cleared by construction projects on adjacent properties. These <br />areas are tributary to the site and during larger rainfall events this runoff will follow its existing <br />path over the trail on its way out to the Snohomish River. <br />Description of final stabilization (example: extent of revegetation, paving, landscaping): <br />The project proposes 2,690 linear feet of 10 feet wide asphalt concrete shared use path with <br />associated landscape improvements. The landscaping elements are in conformance with the <br />1999 Conceptual Buffer Enhancement Plan, Riverside Industrial Park by Talasaea Consultants <br />and shoreline environmental requirements described in the January 2018 Draft Riverside <br />Business Park Public Access Trails Biological and Floodplain Assessment by Hart Crowser <br />(Biological and Floodplain Assessment). Existing surfaces to receive plantings will either be <br />tested and shown to support healthy plant growth or be amended. <br />Contaminated Site Information: <br />Proposed activities regarding contaminated soils or groundwater (example: on -site treatment <br />system, authorized sanitary sewer discharge): <br />Previously remediated arsenic -affected soils are located at the north end of the site. These <br />contaminated soils are not anticipated to be affected by this project. See the Independent Clean <br />Up Action Report prepared by Landau Associates in Appendix F for more information. <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.