Laserfiche WebLink
2.1.3 Element 3: Control Flow Rates <br />' Will you construct stormwater retention and/or detention facilities? <br />❑ Yes ® No <br />Will you use permanent infiltration ponds or other low impact development (example: rain <br />gardens, bio-retention, porous pavement) to control flow during construction? <br />❑ Yes® No <br />List and describe BMPs: <br />No BMPs are planned to be implemented to this element. <br />' Installation Schedules: N/A <br />' Inspection and Maintenance plan: N/A <br />Responsible Staff: N/A <br />' Page I8 <br />