Laserfiche WebLink
2.1.2 Element 2: Establish Construction Access <br />List and describe BMPs: <br />• BMP C105: Stabilized Construction Entrance/Exit per City of Everett Standard Drawing <br />No 201 <br />• BMP C106: Wheel Wash <br />• BMP C107: Construction Road/Parking Area Stabilization <br />• BMP C140: Dust Control <br />Construction access or activities occurring on unpaved areas shall be minimized, where <br />necessary, access points shall be stabilized to minimize the tracking of sediment onto public <br />roads. The contractor and Project Manager or designee shall relocate facilities as necessary as <br />construction progresses. If the entrance is not preventing sediment from being tracked onto <br />pavement, then alternative measures to keep the streets free of sediment shall be used. This <br />may include replacement/cleaning of the existing quarry spalls, street sweeping, an increase in <br />the dimensions of the entrance, or the installation of a wheel wash. <br />Installation Schedules: Prior to earthmoving activity and maintained throughout construction. <br />Inspection and Maintenance plan: Per current edition of City of Everett Stormwater <br />Management Manual. <br />Responsible Staff: CESCL <br />Page 17 <br />