Landau Associates <br />— recommendations regarding potential water treatment or disposal requirements <br />associated with any necessary construction dewatering <br />— recommendations regarding control of dust during construction and decontamination <br />of construction equipment before moving it to another site if necessary <br />— recommendations regarding the need to protect existing onsite monitoring wells <br />during construction of the project <br />— a discussion of the subgrade support characteristics along the alignments of the <br />proposed trails and new pavement sections <br />— recommendations for subgrade preparation for trails and new pavement sections, <br />including reuse of site soil, and criteria for selection, placement, and compaction of <br />structural fill, including a discussion of the effects of weather and/or construction <br />equipment on the native soil <br />— a discussion related to expected excavation conditions for site utilities <br />— conclusions regarding the need for dewatering deeper utility excavations <br />— recommendations for pipelines, including trench excavation and support, pipe <br />foundation support, pipe bedding and trench backfill materials in accordance with <br />2016 Washington State Department of Transportation Standard Specifications for <br />Road, Bridge, and Municipal Construction <br />— recommended design criteria for lateral earth pressures on buried structures/vaults <br />— recommended asphalt pavement sections for new pavement sections and trails. <br />Geotechnical Engineering Report <br />Riverside Business Park <br />Public Access Trails and Roadway Improvements 1-3 <br />0121030.010.011 <br />March 22, 2018 <br />