Laserfiche WebLink
ASBESTOS NORTHWEST LLC SURVEY REPORT E S T S <br /> NORTHWEST <br /> 30620 Pacific Hwy S Suite 103 Federal Way,WA 98003 <br /> Tel:253 9414343 Fax:253 9414175 <br /> White Brittle Pipe <br /> Coating Friable Thermal Systems 75-Small Pool Mech Room Boiler <br /> 8-55% Chrysotile Insulation 76-Small Pool Room South Elbow <br /> Asbestos <br /> White Brittle Pipe <br /> Coating Friable Thermal Systems 188- Large Pipe Down To N Boiler <br /> 40% Chrysotile, Insulation 189- East Large Pipe <br /> Amosite <br /> Vermiculite Friable Miscellaneous 78-Wall Outside Main Mechanical Room <br /> <1% Tremolite, Material 79- North Wall of 80's Gym <br /> Actinolite <br /> White Woven Paper Friable Thermal Systems 80- Roof of 20's Building Under <br /> 5/o Chrysotile <br /> Asbestos Insulation Flashing <br /> 90-5th Floor Hall Wall <br /> Joint Compound 92-5th Floor NE Big Room Wall <br /> Composited to <1% Friable Surfacing Material 94-5 Floor SW Room Wall <br /> 96-5th Floor S Mid Room Wall <br /> Chrysotile Asbestos 125-4th Floor Hall Wall <br /> 129-4th Floor Common Wall <br /> Tar Paper Non-Friable <br /> 15% Chrysotile Miscellaneous Material 102-5th Floor Bathroom Door Opening <br /> Asbestos —12ft2 <br /> Corrugated Pipe Wrap Friable Thermal Systems 124-4th Floor Small Bathroom Wall Pipe <br /> 20-70% Chrysotile Insulation 179-20's Pool Area South Hall <br /> Asbestos 190-Horizontal Pipe over S Door <br /> Texture <br /> Point Counted to Friable Surfacing Material 130-4th Floor Common Room Wall <br /> <1% Chrysotile <br /> Asbestos <br /> Plaster <br /> Point Counted to Friable Surfacing Material 134-3rd Floor Conference Room Wall <br /> <1% Chrysotile <br /> Asbestos <br /> Woven Grey Gasket Friable Thermal Systems <br /> 60% Chrysotile Insulation 192-N Boiler Back Door Gauge <br /> Asbestos 1 ft2 <br /> Asphaltic Gray Sealant Non-Friable <br /> 2% Chrysotile Miscellaneous Material 204- HVAC South Duct Sealant <br /> Asbestos See Conclusions <br /> 16 <br />