My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10617 ROSEWOOD AVE 2022-01-25
>
Address Records
>
ROSEWOOD AVE
>
10617
>
10617 ROSEWOOD AVE 2022-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 1:42:19 PM
Creation date
1/25/2022 1:40:19 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSEWOOD AVE
Street Number
10617
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> KUKHOTSKIY DUPLEX <br /> Minimum Requirement # 2: SWPPP Narrative <br />• Element#1: Mark Clearing Limits <br /> Clearing limits have been shown on the SWPPP Plan. <br /> Element#2: Establish Construction Entrance <br /> The existing driveway with access to Rosewood Avenue will be used as a temporary <br />• construction entrance. All vehicles shall be free of debris prior to leaving the site. <br /> Element#3: Control Flow Rates <br /> Flow rates during construction are to be contained through the installation of silt fencing <br /> along the downstream clearing limits. <br />• <br /> Element#4: Install Sediment Controls <br /> Sediment controls mainly consist of installing silt fencing along the downstream clearing <br /> limits. <br /> Element#5: Stabilize Soils• <br /> All soils disturbed during site grading will be stabilized by use of the most appropriate <br /> BMP method available. These consist of short-term and long-term solutions: Short-term <br /> methods consist of compaction of the soils by vibratory roller or bulldozer. Long-term <br /> methods consist of straw covering over the soils (this is in the case of the project becoming <br /> dormant for greater than 1 month). At this time no wintertime grading or construction <br />• activities will occur. During construction periods longer than 1 working week (7 days) <br /> where the soils are exposed and un-worked will use the proscribed methods in the Storm <br /> Water Management Manual for Western Washington to reduce sedimentation transported <br /> offsite. If winter grading is conducted, all exposed soils shall be covered within 2 days. <br />• Element# 6: Protect Slopes <br /> No steep slopes exist on-site; steep slope protection is not required. <br /> Element# 7: Protect Drain Inlets <br /> Catch basin and culvert inlets within the downstream vicinity of the site will be protected <br />• with catch basin inserts and triangular silt dams,respectively. <br /> Element# 8: Stabilize Channels and Outlets <br /> Channels and drainage outlets are not needed around the proposed development area on <br /> site. No stabilization is necessary. Existing channels or drainage outlets located within 500- <br />• feet of the property of the property should be routinely inspected for debris that may dam <br /> and/or aid erosion. <br /> Element# 9: Control Pollutants <br /> All pollutants from construction vehicles will be contained and disposed of in the approved <br /> manner consistent with state environmental policies. Any vehicle maintenance will be <br />• performed by authorized mechanics using drip pans and waste containment vessels. All <br /> pollutants will be disposed offsite at approved facilities. <br />• WESTERN ENGINEERS,INC. 14 PROJECT:19-1825-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.