Laserfiche WebLink
• <br /> KUKHOTSKIY DUPLEX <br /> Element# 10: Control De-Watering <br />• De-watering of the site is not expected. If dewatering of the site is needed, all groundwater <br /> removed shall be retained and recharged into the ground after de-watering has been <br /> finalized. <br /> Element# 11: Maintain BMPs <br /> All Temporary Erosion and Sedimentation Control (TESC) devices and equipment will be <br />• inspected and maintained on a weekly basis_ if not sooner, based on storm events <br /> contributing to runoff. When construction is complete and the site is stabilized, any <br /> existing sediment will be removed and stabilized onsite. <br /> Element# 12: Manage the Project <br /> A general construction manager will manage the project for or by the owners. The <br /> construction manager shall maintain all the above items in order to minimize sediment <br /> transport and turbid water leaving the site. His job will entail continual observation of the <br /> grading operations to ensure minimal effects to adjacent properties and offsite waterways. <br /> Element# 13: Protect On-Site Stormwater BMPs <br />• Compost amended vegetated areas and future infiltration areas will be protected from <br /> compaction and sedimentation when feasible during construction. <br /> Minimal Requirement # 3: Water Pollution Source Control <br /> All proposed development is to consist of residential construction.No water pollution <br />• source control is needed. <br /> Minimum Requirement # 4: Preservation of Natural Drainage Systems and <br /> Outfalls, and provisions of off-site mitigation <br />• No changes to the existing drainage systems and outfalls are proposed with this <br /> development. All proposed runoff from the project area is to disperse to maintain natural <br /> drainage paths and systems. <br /> Minimum Requirement #5 On-Site Storm Water Management <br />• <br /> Due to the project proposing more than 5,000 sf of new hard surfaces, Minimum <br /> Requirements 1 through 9 must be evaluated. As such, the project shall use List#2 to <br /> evaluate on-site stormwater management BMP feasibility. <br />• <br />• <br />• WESTERN ENGINEERS,INC. 15 PROJECT: 19-1825-A <br />