My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10617 ROSEWOOD AVE 2022-01-25
>
Address Records
>
ROSEWOOD AVE
>
10617
>
10617 ROSEWOOD AVE 2022-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 1:42:19 PM
Creation date
1/25/2022 1:40:19 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSEWOOD AVE
Street Number
10617
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> KUKHOTSKIY DUPLEX <br /> Element# 10: Control De-Watering <br />• De-watering of the site is not expected. If dewatering of the site is needed, all groundwater <br /> removed shall be retained and recharged into the ground after de-watering has been <br /> finalized. <br /> Element# 11: Maintain BMPs <br /> All Temporary Erosion and Sedimentation Control (TESC) devices and equipment will be <br />• inspected and maintained on a weekly basis_ if not sooner, based on storm events <br /> contributing to runoff. When construction is complete and the site is stabilized, any <br /> existing sediment will be removed and stabilized onsite. <br /> Element# 12: Manage the Project <br /> A general construction manager will manage the project for or by the owners. The <br /> construction manager shall maintain all the above items in order to minimize sediment <br /> transport and turbid water leaving the site. His job will entail continual observation of the <br /> grading operations to ensure minimal effects to adjacent properties and offsite waterways. <br /> Element# 13: Protect On-Site Stormwater BMPs <br />• Compost amended vegetated areas and future infiltration areas will be protected from <br /> compaction and sedimentation when feasible during construction. <br /> Minimal Requirement # 3: Water Pollution Source Control <br /> All proposed development is to consist of residential construction.No water pollution <br />• source control is needed. <br /> Minimum Requirement # 4: Preservation of Natural Drainage Systems and <br /> Outfalls, and provisions of off-site mitigation <br />• No changes to the existing drainage systems and outfalls are proposed with this <br /> development. All proposed runoff from the project area is to disperse to maintain natural <br /> drainage paths and systems. <br /> Minimum Requirement #5 On-Site Storm Water Management <br />• <br /> Due to the project proposing more than 5,000 sf of new hard surfaces, Minimum <br /> Requirements 1 through 9 must be evaluated. As such, the project shall use List#2 to <br /> evaluate on-site stormwater management BMP feasibility. <br />• <br />• <br />• WESTERN ENGINEERS,INC. 15 PROJECT: 19-1825-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.