Laserfiche WebLink
12/3/2021 Page <br /> City of Everett <br /> 6:54:5iAM <br /> INSPECTION ACTIVITY REPORT <br /> -- <br /> Permit No. P2101-028 Site Address 2902 RUCKER AVE <br /> Applied 1/22/2021 Applicant Misty Pomada Lot <br /> Approved 1/26/2021 Owner DMT RUCKER LLC Block <br /> Issued 1/26/2021 Contractor COMFORT SYSTEMS USA(NW)INC Tract <br /> Parent Permit No. B2003-043 Description Installing plumbing fixtures-1st floor+complete building <br /> Notes Installing plumbing fixtures per approved set of plans <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 2/10/2021 2/10/2021 PLUMB TAHU PARTIAL APPR (2/10/2021 4:14 PM TAHU) <br /> 02-GROUND 1)new under ground DWV fok. <br /> 2)The existing toilet on level 1 is 21"from <br /> the side wall.ADA code requires the center <br /> line of the toilet to be 16"-18"from the <br /> side wall. <br /> 2/10/2021 2/10/2021 PLUMB 05-OTHER SDP OTHER permit discription of (3/30/2021 9:52 AM SDP) <br /> work This plumbing permit covers the whole <br /> building;shell and TI work. <br /> Finals will be listed as Partial approval until <br /> all work is complete. <br /> 2/10/2021 2/10/2021 PLUMB TAHU PARTIAL APPR see.notes 2/9/2021 9:45 AM Bryan Cooley <br /> 03-ROUGH IN <br /> Contact Name:Bryan Cooley <br /> Site Address:2902 RUCKER AVE <br /> Phone:4252469180 <br /> e-Mail:bcooley@csusanw.com <br /> (2/10/2021 3:59 PM TAHU) <br /> 1)DWV rough in is ok up to bottom of 2nd <br /> floor. <br /> 2)water rough in,in wall ok from grid lines <br /> 2 to 4 and C to E <br /> 3)note:the 1/2"water line supply for the <br /> reverse osmosis.needs a RPBA on it. <br /> (3/29/2021 4:30 PM TAHU) <br /> 4 Second floor DWV and water needs a <br /> inspection for rougnh in. <br /> 5 Oil sand intereptor will be completed after <br /> the wall are finished for elevator shaft <br /> 6 call for final plumbing when all items are <br /> completed,with RPBA report <br /> 2/18/2021 2/18/2021 PLUMB TAHU PARTIALAPPR see notes 2/16/2021 2:58 PM Bryan Cooley <br /> 02-GROUND <br /> Contact Name:Bryan Cooley <br /> Site Address:2902 RUCKER AVE <br /> Phone:4252469180 <br /> e-Mail:bcooley@csusanw.com <br /> (2/17/2021 3:51 PM TAHU) <br /> Shower rough in and sink at grind line 3 <br /> between D and D.2 on level 1.ground work <br /> competed,ok <br /> (3/29/2021 3:52 PM TAHU) <br /> INSP12 <br />