My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2902 RUCKER AVE 2022-01-25
>
Address Records
>
RUCKER AVE
>
2902
>
2902 RUCKER AVE 2022-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 2:28:18 PM
Creation date
1/25/2022 2:27:11 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2902
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/3/2021 City of Everett Page 2 <br /> 6:54:5RAM <br /> INSPECTION ACTIVITY REPORT <br /> 2/25/2021 2/25/2021 PLUMB SDP PARTIAL APPR 2/24/2021 12:46 PM Bryan Cooley <br /> 03-ROUGH IN <br /> Contact Name:Bryan Cooley <br /> Site Address:2902 RUCKER AVE <br /> Phone:4252469180 <br /> e-Mail:bcooley@csusanw.com <br /> (2/25/2021 2:26 PM SDP) <br /> 1)Sink rough in on first floor in corridor <br /> wall(north)between D-E and 5-6. <br /> (2/25/2021 2:30 PM SDP) <br /> NOTE:Concrete drain line under slab at <br /> elevator pit is ok to pipe to the surface with <br /> a clean out,using approved materials.As <br /> long as it is still tied into the sewer outside <br /> and usable. Contractor states that Cozy <br /> heating has done a visual inspection with a <br /> camera. <br /> 4/13/2021 4/13/2021 PLUMB 06-FINAL TAHU PARTIAL APPR see notes (4/13/2021 3:24 PM TAHU) <br /> The TI is on level 1 and is completed,for <br /> plumbing partial final <br /> 5/12/2021 5/12/2021 PLUMB TAHU APPROVAL see notes 5/11/2021 12:02 PM Bryan Cooley <br /> 03-ROUGH IN <br /> Contact Name:Bryan Cooley <br /> Site Address:2902 RUCKER AVE <br /> Phone:4252469180 <br /> e-Mail:bcooley@csusanw.com <br /> (5/12/2021 11:48 AM TAHU) <br /> Rough in on second level-2 ok <br /> Note OK to insulate over flows and roof <br /> drains on level-2 <br /> (5/12/2021 4:05 PM TAHU) <br /> Note.Talked to contractor about backing for <br /> the grab bars for the second level bathroom <br /> 9/8/2021 9/8/2021 PLUMB SDP APPROVAL eTRAKiT Inspection 9/7/2021 1:10 PM Misty Pomada <br /> 03-ROUGH IN Request <br /> Contact Name:Ken Graham <br /> Site Address:2902 RUCKER AVE <br /> Phone:4254094404 <br /> e-Mail:kgraham@csusanw.com <br /> (9/8/2021 2:58 PM SDP) <br /> They have relocated a bathroom on the <br /> second floor and added a shower at column <br /> line E-6. <br /> I discussed with the contractor that if above <br /> bathroom is required to meet accessible <br /> standards,the shower that is installed will <br /> not comply.It appears to be in a private <br /> office. <br /> 11/24/2021 11/24/2021 PLUMB 07-FINAL JJM APPROVAL eTRAKiT Inspection 11/19/2021 4:08 PM Tim Irvin <br /> Request <br /> Contact Name:Tim Irvin <br /> Site Address:2902 RUCKER AVE <br /> Phone:3603178125 <br /> e-Mail:ocg.11c@yahoo.com <br /> (11/24/2021 12:58 PM JJM) <br /> -Full approval after ADA bars are installed <br /> in restrooms. <br /> INSP12 CfRWS T:M5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.