My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/02/09 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/02/09 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 3:27:29 PM
Creation date
2/10/2022 10:58:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/9/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAASSOCIATES <br />EXHIBIT A <br />January 19, 2022 <br />City of Everett Public Works <br />3200 Cedar Street <br />Everett, WA 98102 <br />Attn: Mr. Souheil Nasr, PE <br />Transmitted via email to: SNasr@everettwa.gov <br />Re: Environmental Support —Scope and Estimated Cost <br />Port of Everett Combined Sewer Main Improvements <br />Everett, Washington <br />Dear Mr. Nasr: <br />LANDAU <br />Landau Associates, Inc. (LAI) is pleased to submit this proposal for environmental support services to <br />the'City of Everett (City) for the Port of Everett (Port) Combined Sewer Main Improvements project <br />(the project). The project will be conducted at the Port within a construction easement granted by the <br />Port, and crosses two Washington State Department of Ecology (Ecology) Model Toxics Control Act <br />(MTCA) cleanup sites: the Kimberly-Clark Worldwide Site (K-C Site) and the ExxonMobil/ADC Site <br />(Exxon/ADC Site). LAI's first primary objective is to document environmental conditions encountered <br />by the City during construction of the project to support any coordination between the City and the <br />Port in the event that unanticipated hazardous materials are encountered. LAI's second primary <br />objective is to support the City's implementation of the project in accordance with the K-C Site Soil <br />and Groundwater Management Plan and the Exxon/ADC Site Soil and Groundwater Management <br />Plans (SGMPs; LAI 2021a, 2021b). These SGMPs were prepared by LAI for the Port to guide intrusive <br />activities within each cleanup site during marine terminal improvements (MIE project) being <br />conducted by the Port, and they were subsequently adopted by the City for use during the project. <br />The project is expected to be conducted from late March through June 2022 and will occur <br />concurrently with the Port's MIE project, which LAI is also supporting for the Port. MIE project support <br />includes documenting environmental conditions within the construction easement and supporting <br />implementation of the SGMPs. LAI understands both the City and Port concur that LAI providing <br />environmental support on both projects is beneficial to both parties and does not represent a conflict <br />of interest. <br />The following sections present the proposed scope and budget, which consists of the following tasks: <br />• Construction Engineering Support <br />• Ecology Coordination <br />155 NE 100th St, Ste 302 • Seattle, WA 98125 • 206.631.8680 • www.landauinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.