My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 111 <br /> Representative to determine the facts or contentions involved in the Contract Claim. Owner is not <br /> obligated to respond to a Contract Claim unless the Contractor is in full compliance with all the <br /> provisions of the General Conditions and the formal Contract Claim document has been submitted. <br /> Full compliance by the Contractor with the provisions of this Section 12 is a contractual condition <br /> precedent to the Contractor's right to sue or seek any recovery against the Owner in any legal proceeding. <br /> 12.2 CONTENTS <br /> All Contract Claims filed by the Contractor shall be in writing,verified under penalty of perjury by an <br /> officer or principal of the Contractor,and in sufficient detail to enable the Owner's Representative to <br /> ascertain the basis and amount of the Contract Claim. All Contract Claims shall be submitted to the <br /> Owner's Representative. At a minimum,each Contract Claim must include: <br /> 1. A detailed factual statement of the Contract Claim for additional compensation <br /> and extension of Contract Time,if any,providing all necessary dates,locations, <br /> and items of work affected by the Contract Claim. <br /> 2. The dates of all facts related to the Contract Claim. <br /> 3. The name of each Owner's individual,official, or employee involved in or <br /> knowledgeable about the Contract Claim. <br /> 4. The specific provisions of the Contract that support the Contract Claim and a <br /> statement of the reasons why such provisions support the Contract Claim. <br /> 5. If the Contract Claim relates to a decision of the Owner's Representative that <br /> the Contract leaves to the Owner's Representative's discretion or as to which <br /> the Contract provides that the Owner Representative's decision is final,the <br /> Contractor shall set out in detail all facts supporting its position relating to the <br /> decision of the Owner's Representative. <br /> 6. Identification of any documents and the substance of any oral communications <br /> that support the Contract Claim. <br /> 7. Copies of any identified documents that support the Contract Claim, other than <br /> O documents and i fu O th <br /> I Contractor.wner Standard industry manualsdocumentsprev mayously be incorporated <br /> rnishedtothe by wner reference.by e <br /> 8. If Contractor seeks an extension of Contract Time: <br /> a. The specific amount of time(including days and dates) sought. <br /> b. The specific reasons the Contractor believes an extension of Contract <br /> Time should be granted,including,but not limited to,compliance with <br /> the requirements of 5.2.2.2 Extensions of Contract Time;and <br /> c. The specific provisions of the Contract Documents under which it is <br /> sought. <br /> 9. If additional compensation is sought,the exact amount sought and a breakdown <br /> of that amount into the following categories: <br /> a. Labor <br /> b. Materials <br /> c. Direct Equipment. The actual cost for each piece of equipment for <br /> which a Contract Claim is made or in the absence of actual cost,the <br /> rates established by the AGC/WSDOT Equipment Rental Agreement <br /> that was in effect when the work was performed. In no case shall the <br /> amounts sought or paid for each piece of equipment exceed the rates <br /> established by the Equipment Rental Agreement even if the actual cost <br /> General Conditions—007200-45 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.