Laserfiche WebLink
I <br /> for such equipment is higher. The Owner may audit the Contractor's <br /> cost records to determine actual equipment cost. The following <br /> information shall be provided for each piece of equipment: <br /> i. Detailed description (e.g., Motor Grader Diesel Powered <br /> Caterpillar 12 "G", Tractor Crawler ROPS & Dozer Included <br /> Diesel) <br /> ii. The hours of use or standby; and <br /> iii. The specific day and dates of use or standby; I <br /> iv. Job Overhead. <br /> v. Overhead(general and administrative). <br /> vi. Subcontractor's contract claims (in the same level of detail as <br /> specified herein is required for all Subcontractor's contract <br /> claims); and <br /> vii. Other categories as specified by the Contractor or the Owner. <br /> 10. A notarized statement shall be submitted to the Owner's Representative <br /> containing the following language: I <br /> Under the penalty of law for perjury or falsification,the undersigned, <br /> I <br /> (name) (title) <br /> of I <br /> (company) <br /> hereby certifies that the Contract Claim for extra compensation and extension of Contract r <br /> Time, if any,made herein for Work on this Contract is a true and complete statement of <br /> the factual basis of the Contract Claim and all actual costs incurred and time sought,and <br /> is fully documented and supported under the Contract between the parties. <br /> Date /s/ <br /> Subscribed and sworn before me this day of I <br /> Notary Public <br /> My Commission Expires: I <br /> 12.3 FALSE OR OMITTED INFORMATION <br /> The Contractor waives each Contract Claim for which it presents material information that it knows,or in <br /> the exercise of reasonable care should know,is false, or omits or fails to disclose material information <br /> relating to such Contract Claim. In such case, Contractor shall reimburse the Owner for any and all fees <br /> and expenses incurred in investigating any such Contract Claim. <br /> 12.4 REMEDIES <br /> 12.4.1 General <br /> If a Contract Claim has merit in whole or in part,then Contractor's sole remedies shall be those provided <br /> in this subsection. Contractor must timely and strictly comply with the requirements of 10.NOTICE TO <br /> OWNER, 11.DIFFERING SITE CONDITIONS, 12.CONTRACT CLAIMS and all other General I <br /> General Conditions—007200-46 <br /> I <br />