Laserfiche WebLink
r <br /> Section 00 21 13 <br /> INSTRUCTIONS TO BIDDERS <br /> Bidder has 15 calendar days after receiving the Notice of Award to submit the following <br /> documents to the City: <br /> • Two(2)executed copies of the Contract. I <br /> • Contract bond or equivalent performance and payment bond per Section 007200, Part <br /> 15.2 "Bonds",of the Contract Documents. <br /> • Certificate of Insurance and additional insured endorsement, Section 007200, Part 15.3 <br /> "Insurance", of the Contract Documents. <br /> A Contract shall not be formed until the Contract Documents are signed by the Mayor. <br /> 1.13 Time of Completion <br /> The Contractor shall complete the Work on or before the date or dates specified in Section 005213 - <br /> Contract. <br /> 1.14 Wages <br /> All laborers,workmen, or mechanics in each trade or occupation employed in the performance of the <br /> Contract either by Contractor, Subcontractor, or other person doing Work shall be paid not less than the <br /> prevailing rate of wage as defined in RCW 39.12.010. Current prevailing wage rates available from the <br /> State of Washington Department of Labor and Industries for Snohomish County may be found on line at <br /> http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/ The rules and regulations noted within <br /> the Contract Documents are available from: <br /> State of Washington Department of Labor and Industries City <br /> Employment Standards Division <br /> General Administration Building I <br /> Olympia, Washington 98504 <br /> Contact: Janet Day <br /> (206) 753-6317 1 <br /> Bidders are advised to examine and to be thoroughly familiar with such requirements. No claim for <br /> additional compensation will be allowed that is based upon a lack of knowledge of these requirements or <br /> a failure to include adequate increases in such wages over the term of this Contract in the Bidder's bid <br /> price. <br /> 1.15 Equal Employment Opportunity <br /> 111 <br /> The Contractor will be required to assure that equal employment opportunities will be in effect to all <br /> individuals throughout the length of this Contract, pursuant to Section 007200-, Part 7"Labor Standards," <br /> of the Contract Documents. The Contractor must comply with all local, state and federal laws pertaining <br /> to non-discrimination and equal employment opportunity. <br /> 1.16 DBE/WBE Subcontractor Requirements <br /> The Contractor is required to actively solicit bids for subcontract work from "Disadvantaged Business , <br /> Enterprises" (DBE's) and "Women's Business Enterprises" (WBE's). The Contractor is required also to <br /> document such effort on the "City of Everett Disadvantaged/Women's Business Enterprise" form and to <br /> submit said form, in accordance with Section 004539 of the Contract Documents, with its Bid. <br /> 1.17 Non-Collusion Affidavit <br /> The Contractor must submit a"Non-Collusion Affidavit"in accordance with Section 004519 of the Contract I <br /> Documents as part of the Bid package. If the City has reason to believe that collusion exists among <br /> Rotary Park Renovation 8 of 11 <br /> I <br />