Laserfiche WebLink
I <br /> Section 01 1100 <br /> Summary of Work <br /> these specifications and the drawings. <br /> 1.07 CONTRACTOR'S USE OF PREMISES <br /> A. The Contractor shall assume full responsibility for protection and safekeeping of <br /> products under this Contract. <br /> B. The Contractor shall obtain and pay for use of additional storage for Work areas <br /> needed for operations. <br /> 1.08 CHECKING PLANS AND SPECIFICATIONS <br /> A. PRIOR SUBMISSION OF BIDS:The Contractor shall report any discrepancies or omissions <br /> in the plans and/or specifications to the Architect for a decision prior to the Submission <br /> of Bids. <br /> 1 B. RESOLUTION OF CONFLICTS: Where there is conflict between the plans and the <br /> specifications in regard to materials,equipment, sizes, numbers or locations,the Owner <br /> shall be the sole judge in resolving the conflict. <br /> -END OF SECTION- <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Rotary Park Renovation Page 3 of 4 <br /> I <br />