My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Substitution Procedures <br /> Section 0125 00 <br /> PART 1—GENERAL <br /> 1.01 GENERAL <br /> A. This Section specifies administrative and procedural requirements governing the <br /> Contractor's selection of products for use in the project, and administrative procedures <br /> for handling requests for substitutions made after award of Contract. <br /> 1 1.02 DEFINITIONS <br /> A. Definitions used in this paragraph are not intended to negate the meaning of other <br /> terms used in the Contract Documents. <br /> 1. "Products" are items purchased for incorporation in the Work, regardless of <br /> whether they were specifically purchased for the project or taken from the <br /> Contractor's previously purchased stock. <br /> 2. "Named Products" are products identified by use of the manufacturer's name <br /> for a product, including such items as a make or model designation,as recorded <br /> in published product literature, of the latest issue as of the date of the Contract <br /> Documents. <br /> 3. "Materials" are products that must be substantially cut,shaped worked, mixed, <br /> finished, refined or to otherwise fabricated, processed, or installed to form units <br /> of work. <br /> 4. "Equipment" is defined as a product with operational parts, regardless of <br /> whether motorized or manually operated,and in particular, a product that <br /> requires service connections such as wiring or piping. <br /> 5. The terms"equal", "or equal", "or approved equal" and "or approved" are <br /> synonymous. All proposed "equal" products, materials, and equipment must be <br /> approved by the substitution request process. <br /> ' 1.03 QUALITY ASSURANCE <br /> A. SOURCE LIMITATIONS: Provide product of same kind,to fullest extent possible,from a <br /> single source. <br /> B. COMPATIBILITY OF OPTIONS: When Contractor is given the option of selecting between <br /> two or more products for use on the Project,the product selected shall be compatible <br /> with products previously selected,even if previously selected products were also <br /> options. <br /> C. NAME PLATES: Except for required labels and operating data,do not attach or imprint <br /> manufacturer's or producer's nameplates or trademark on surfaces of products which <br /> will be exposed to view in occupied spaces or on the exterior. <br /> 1. LABELS: Locate required product labels and stamps on a concealed surface or, <br /> ' where required for observation after installation,on an accessible surface that is <br /> not conspicuous. <br /> Rotary Park Renovation 1 of 6 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.