Laserfiche WebLink
I <br /> Substitution Procedures <br /> Section 0125 00 I <br /> 1.04 SUBMITTALS <br /> A. PRODUCT LISTING SUBMITTAL: Submit three(3) copies of the product-listing schedule I <br /> within thirty(30)days after the date of commencement of the Work. Provide a written <br /> explanation for omissions of data,and for known variations from Contract <br /> requirements. At Contractor's option, initial submittal of the product-listing schedule <br /> may be limited to product selections and product designations that must be established <br /> early in the contract time. Submit completed product-listing schedule within sixty(60) <br /> days after commencement of the Work. I <br /> 1.05 PRODUCT DELIVERY,STORAGE,AND HANDLING <br /> A. Deliver, store, and handle products in accordance with the manufacturer's I <br /> recommendations, using means and method that will prevent damage, deterioration <br /> and loss, including theft. I <br /> B. Schedule delivery to minimize long-term storage at the site and to prevent <br /> overcrowding of construction spaces. I <br /> C. Coordinate delivery with installation time to ensure minimum holding time for items <br /> that are flammable, hazardous, easily damaged, or sensitive to deterioration,theft and I <br /> other losses. <br /> D. Deliver products to the site in the manufacturer's original sealed container or other <br /> packaging system, complete with labels and instruction for handling, storing, unpacking, <br /> protecting and installing. <br /> E. Inspect products upon delivery to ensure compliance with the contract documents, and I <br /> to ensure that products are undamaged and properly protected. <br /> F. Store products at the site in a manner that will facilitate inspection and measurement of I <br /> quantity or counting of units. <br /> G. Store heavy materials away from the project structure in a manner that will not I <br /> endanger the supporting construction. <br /> H. Store products subject to damage by the elements above ground, under cover in a I <br /> weather-tight enclosure, with ventilation adequate to prevent condensation. Maintain <br /> temperature and humidity within range required by manufacturer's instructions. <br /> I. OFF-SITE STORAGE: If requested by the Contractor and approved in writing by the II <br /> Owner,the Owner may make payment to the Contractor for products stored off-site. <br /> J. OWNER-FURNISHED MATERIALS: When materials or equipment furnished by the Owner I <br /> for installation by the Contractor are to be delivered and stored prior to installation, the <br /> Contractor shall provide suitable,secure storage and protect from damage,theft or <br /> other loss until installation. <br /> Rotary Park Renovation 2 of 6 I <br />