Laserfiche WebLink
i <br /> Substitution Procedures <br /> Section 01 25 00 <br /> 3. REGULATORY REQUIREMENTS: Final interpretation of code, regulatory <br /> requirements, safety requirements,or insurance requirements necessitate a <br /> change due to inability of the specified item to conform. <br /> 4. WARRANTY: Manufacturer or fabricator cannot certify or warrant performance <br /> of specified item as required. <br /> 5. OWNER'S BENEFIT: In the judgment of the Architect, acceptance of the <br /> proposed substitution is clearly in the Owner's best interest because of cost, <br /> quality,or other consideration. In requesting a substitution under this clause, <br /> the Contractor shall furnish substantiation of any such reason. I <br /> G. Substitutions will not be considered if they are indicated or implied on shop drawings or <br /> other project data submittals, without proper notice shown on Section 00 63 25. I <br /> H. WORK-RELATED SUBMITTALS: Contractor's submittal of, and Architect's acceptance of, <br /> shop drawings, product data or samples which indicate Work not complying with <br /> requirements of Contract Documents, does not constitute an acceptable and valid <br /> request for, nor approval of, a substitution. <br /> - END OF SECTION- <br /> I <br /> I <br /> I <br /> I <br /> i <br /> I <br /> I <br /> I <br /> Rotary Park Renovation 6 of 6 <br /> i <br />