My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Substitution Procedures <br /> 1 Section 0125 00 <br /> 2. That the Contractor shall provide the same warranty for the substitution as he <br /> would for that specified. <br /> 3. That the Contractor will coordinate all trades, including changes thereto as may <br /> be required,that he waives all claims for additional costs which subsequently <br /> become apparent as a consequence of the substitution and that the Contractor <br /> I will bear all costs related thereto. <br /> 4. If, in the opinion of the Owner,the proposed substitution is not equal or better <br /> in every respect to that specified,the Contractor shall furnish the specified <br /> Imaterial or product at no additional cost to the Owner. <br /> E. CONDITIONS: Contractor's request for substitution will be reviewed and considered <br /> I except as noted when extensive revisions to Contract Documents are not required and <br /> changes are in keeping with the general intent of Contract Documents;when timely, <br /> fully documented and properly submitted; and when one or more of the following <br /> I conditions is satisfied,all as judged by Owner. Otherwise, requests will be returned <br /> without action except to record non-compliance with these requirements. <br /> I 1. Where request is directly related to an "or equal" clause or other language of <br /> same effect in Contract Documents. <br /> 2. Where required product, material or method cannot be provided within <br /> I Contract Time, but not as a result of Contractor's failure to pursue the work <br /> promptly or coordinate various activities properly. <br /> 3. Where required product,material, or method cannot be provided in a manner <br /> I which is compatible with other materials of the work,or cannot be properly <br /> coordinated therewith,or cannot be used without adversely affecting Owner's <br /> insurance coverage on completed work, or will encounter other substantial non- <br /> I compliances which are not possible to otherwise overcome except by making <br /> requested substitution,and Contractor thereby certifies to overcome such <br /> noncompliance, non-coordination, non-warranty, non-insurability, or other non- <br /> compliance as claimed. <br /> I4. Where required product, material or method cannot receive approval by a <br /> governing authority, and requested substitution can be so approved. <br /> 5. Where substantial advantage is offered Owner, in terms of cost,time or other <br /> I valuable considerations, after deducting offsetting responsibilities,Owner may <br /> be required to bear, including additional compensation to Architect for redesign <br /> and evaluation services, increased cost of other work by Owner or separate <br /> IContractors, and similar considerations. <br /> F. After sixty(60) calendar day period following"Notice To Proceed": Requests for <br /> I approval of substitute materials will not be considered,except if one or more of the <br /> following conditions exists. With his request,the Contractor shall indicate,which <br /> condition the Contractor believes applies. <br /> I1. UNAVAILABILITY: A substitution is required because the specified item is not <br /> available,due to factors beyond the control of the Contractor. <br /> I 2. UNSUITABILITY: Subsequent information or changes disclose inability of the <br /> specified item to perform as intended. <br /> IRotary Park Renovation 5 of 6 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.