I <br /> Project Meetings <br /> I <br /> Section 01 31 19 <br /> 11. Review delivery schedules. <br /> 12. Coordinate work. <br /> I13. Review proposed changes for: <br /> a. Effect on construction schedule and on completion date. <br /> b. Effect on any other contracts of the project. <br /> I <br /> 14. Review draft of application for payment (at end of month). <br /> 15. Review required revisions to project record documents. <br /> 16. Review project safety. <br /> 1 <br /> 17. Review any other business. <br /> 1.01 PRE-INSTALLATION MEETINGS <br /> IA. These meetings will be held a minimum of 10 days prior to beginning work on each work <br /> discipline as identified within these specifications. These meetings shall take place following <br /> I the regular progress meetings or as agreed. Contractor is responsible to schedule and <br /> administer these meetings. <br /> IB. Suggested Meetings: <br /> 1. Construction Area Access. <br /> I 2. Demolition. <br /> 3. Concrete. <br /> 4. Storm Drainage <br /> IC. Attendees: <br /> 111 1. Architect and Architect's consultants as appropriate. <br /> 2. Contractor's Superintendent. <br /> 3. Subcontractor as appropriate. <br /> 4. Foreman supervising work. <br /> I <br /> 5. Others as appropriate. <br /> D. Agenda: <br /> I1. Submittals-Approved? Review contract requirements. <br /> 2. Materials-available and ready for use. <br /> 1 3. Persons responsible for work. <br /> 4. Test-required tests,who samples and how often? Criteria for performance of work. <br /> 5. Safety. <br /> I <br /> 6. Substrate-criteria for approving substrate. <br /> E. Contractor shall record, reproduce and distribute copies of minutes within three(3) days of each <br /> Imeeting to all meeting participants. <br /> ' PART 2—PRODUCTS <br /> NOT USED <br /> IRotary Park Renovation 3 of 4 <br />