Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Project Meetings <br /> Section 01 31 19 <br /> 4. Change Orders: <br /> a. Origination. <br /> b. Required cost breakdown. <br /> c. Inclusion in monthly pay application. <br /> d. Time extension. <br /> 5. Payments: <br /> a. Schedule of Values. <br /> b. Progress payment review at Project Site. <br /> c. Monthly progress payment cut-off date. <br /> 6. Site Visits: <br /> a. Dates and times of Engineer's visits. <br /> b. Engineer's visit report. ' <br /> 7. Record Documents. <br /> 8. Finish and Coordination. <br /> 9. Notice to Proceed. <br /> 10. Other Topics as Appropriate to Project. <br /> D. Engineer will record minutes and issue copies to all in attendance. ' <br /> 1.02 PROGRESS MEETINGS <br /> A. Meeting Location: Contractor's project field office, unless otherwise agreed. <br /> B. Attendance shall include Owner,Architect,Contractor, Project Superintendent, and others as <br /> appropriate to agenda for each meeting. <br /> C. The Contractor shall: <br /> 1. Prepare agenda and administer progress meetings, and specially called meetings <br /> p Y g <br /> throughout work progress. <br /> 2. Preside at meetings. <br /> 3. Record minutes; include all significant proceedings and decisions. <br /> 4. Reproduce and distribute copies of minutes within three (3) days of each meeting to all <br /> meeting participants. <br /> 5. Ascertain that work is prosecuted consistently with contract documents and <br /> construction schedules. <br /> D. SUGGESTED AGENDA: <br /> 1. Review and approve minutes of previous meeting. I <br /> 2. Review work progress since previous meeting. <br /> 3. Review plans for progress for succeeding work period. <br /> 4. Review construction schedule. <br /> 5. Present corrective measures and procedures to regain project schedule, as applicable. <br /> 6. Present field observations, problems, and conflicts. <br /> 7. Discuss problems impeding progress schedule. <br /> 8. Review Quantity Control. <br /> 9. Review submittal schedules; present methods to expedite as required. <br /> 10. Review off-site fabrication. <br /> Rotary Park Renovation 2 of 4 <br /> I <br />