Laserfiche WebLink
I <br /> ICity of Everett 00 43 36 - 2 <br /> Rotary Park Renovation PW# 2021-072 <br /> IPART B WATERWAY AND MARINE SUBCONTRACTOR <br /> 1. For the work listed below, bidder MUST either identify itself or a subcontractor for each <br /> category of work in the chart below. <br /> I 2. Bidder's bid shall be deemed non-responsive and void if: <br /> a. Bidder fails:(1)to submit on the chart below the name of a subcontractor for each <br /> category of specialty work listed below or(2)to name itself on the chart below to <br /> I perform such work;or <br /> I <br /> b. Bidder names two or more subcontractors on the chart below to perform the same <br /> category of specialty work. <br /> I3. The requirement to name the bidder's proposed subcontractors applies to subcontractors <br /> who will contract directly with the general contractor submitting the bid to the City. <br /> 1 <br /> Category of Work Bidder or Name of Subcontractor <br /> I <br /> Al_ r-tf E-1. LC( IP A.S3-14.4.--, <br /> Waterway and Marine `gyp" <br /> (Either bidder or one subcontractor MUST be <br /> stated) M % Y"i` i/A-Q_.. b E 2- <br /> I <br /> I <br /> NOTE TO BIDDERS: <br /> BIDDERS SHOULD CAREFULLY REVIEW THE SUPPLEMENTAL BIDDER RESPONSIBILTY CRITERIA <br /> CONTAINED IN INSTRUCTIONS TO BIDDERS(SECTION 002113).AMONG OTHER THINGS,THESE <br /> I <br /> CRITERIA REQUIRE THAT SUBCONTRACTOR LISTED ON THIS PAGE MEET CERTAIN EXPERIENCE <br /> REQUIREMENTS. IN ADDITION, IF BIDDER NAMES ITSELF FOR ANY CATEGORY OF WORK ON THIS <br /> PAGE,THEN THE BIDDER ITSELF MUST MEET THE SAME EXPERIENCE REQUIREMENTS. <br /> I <br /> END OF SECTION 00 43 36 <br /> I <br /> I <br /> 00 43 36 - 2 PROPOSED SUBCONTRACTORS FORM <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />